Make-to-order/make-to-stock partitioning decision using the analytic network process
暂无分享,去创建一个
[1] Thomas L. Saaty,et al. The Analytic Network Process: Decision Making With Dependence and Feedback , 2001 .
[2] Vinod Yadava,et al. Design of horn for rotary ultrasonic machining using the finite element method , 2008 .
[3] Sevin Sozer,et al. Product planning in quality function deployment using a combined analytic network process and goal programming approach , 2003 .
[4] Thomas L. Saaty,et al. Decision making with dependence and feedback : the analytic network process : the organization and prioritization of complexity , 1996 .
[5] Ravi Shankar,et al. Selection of logistics service provider: An analytic network process (ANP) approach , 2007 .
[6] T. Saaty,et al. Fundamentals of the analytic network process — Dependence and feedback in decision-making with a single network , 2004 .
[7] T. Narendran,et al. An assignment model for the part-families problem in group technology , 1990 .
[8] Jesús Racero,et al. A systematic approach for product families formation in Reconfigurable Manufacturing Systems , 2007 .
[9] S. Rajagopalan,et al. Make to Order or Make to Stock: Model and Application , 2002, Manag. Sci..
[10] Ozden Ustun,et al. An integrated multi-objective decision-making process for multi-period lot-sizing with supplier selection , 2008 .
[11] S. P. Mitrofanov. SCIENTIFIC PRINCIPLES OF GROUP TECHNOLOGY , 1961 .
[12] Metin Dagdeviren,et al. Using the analytic network process (ANP) in a SWOT analysis - A case study for a textile firm , 2007, Inf. Sci..
[13] A. Kusiak. The generalized group technology concept , 1987 .
[14] Wei-Wen Wu,et al. Selecting knowledge management strategies by using the analytic network process , 2007, Expert Syst. Appl..
[15] D. P. Donk,et al. Combined make-to-order and make-to-stock in a food production system , 2004 .
[16] Ping-Feng Pai,et al. Heuristic PAC model for hybrid MTO and MTS production environment , 2003 .
[17] Manoj Kumar Tiwari,et al. Modeling the metrics of lean, agile and leagile supply chain: An ANP-based approach , 2006, Eur. J. Oper. Res..
[18] Donatella Corti,et al. A capacity-driven approach to establish reliable due dates in a MTO environment , 2006 .
[19] Cevriye Gencer,et al. Analytic network process in supplier selection: A case study in an electronic firm , 2007 .
[20] Nancy Lea Hyer,et al. Procedures for the part family/machine group identification problem in cellular manufacturing , 1986 .
[21] Reza Tavakkoli-Moghaddam,et al. A new decision-making structure for the order entry stage in make-to-order environments , 2008 .
[22] Andrew Kusiak,et al. Grouping of parts and components in flexible manufacturing systems , 1986 .
[23] T. T. Narendran,et al. Machine-cell formation through neural network models , 1994 .
[24] Masoud Rabbani,et al. A comprehensive decision-making structure for acceptance/rejection of incoming orders in make-to-order environments , 2008 .
[25] F. Robert Jacobs,et al. MANUFACTURING PLANNING AND CONTROL SYSTEMS FOR SUPPLY CHAIN MANAGEMENT , 2004 .
[26] M. K. Omar,et al. Hierarchical production planning and scheduling in a multi-product, batch process environment , 2007 .
[27] Ozden Ustun,et al. Multi-period lot-sizing with supplier selection using achievement scalarizing functions , 2008, Comput. Ind. Eng..
[28] Thomas L. Saaty,et al. An Analytic Network Process Model for Financial-Crisis Forecasting , 2004 .
[29] Reza Tavakkoli-Moghaddam,et al. Make-to-order or make-to-stock decision by a novel hybrid approach , 2008, Adv. Eng. Informatics.
[30] Jan Olhager,et al. Strategic positioning of the order penetration point , 2003 .