A heuristic for multi-project scheduling with limited resources in the housing industry

A heuristic scheduling and control model is developed for the multi-project, resource constrained scheduling environment. The model is developed from actual firm data using the Kurtulus and Davis approach to select appropriate heuristic decision rules. Resource profiles, calculation of multi-project resource constrained slack and the schedule are outputs of the model. A routine to update current projects status is provided with this model for control purposes in an ongoing operational environment. While developed for the housing industry, the modelling approach has broad application in a number of multi-project environments.

[1]  F K Levy,et al.  Multiship, multishop, workload‐smoothing progfum , 1962 .

[2]  James Herbert Patterson,et al.  Alternate Methods of Project Scheduling with Limited Resources , 1973 .

[3]  A. V. Napalkov Heuristic Programs for Decision Making , 1968 .

[4]  Richard F. Deckro,et al.  A decomposition approach to multi-project scheduling , 1991 .

[5]  I. Kurtulus,et al.  Multi-Project Scheduling: Categorization of Heuristic Rules Performance , 1982 .

[6]  Edward W. Davis,et al.  A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling , 1975 .

[7]  Edward W. Davis,et al.  Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures , 1973 .

[8]  J. D. Wiest,et al.  A management guide to PERT/CPM: With GERT/PDM/DCPM and other networks , 1977 .

[9]  W. C. Duesterhoeft,et al.  A construction scheduling system with resource allocation for electric utilities , 1977, IEEE Transactions on Engineering Management.

[10]  J. D. Wiest,et al.  Management Guide to PERT/CPM , 1969 .

[11]  Edward A. Wasil,et al.  Project management using a microcomputer , 1986, Comput. Oper. Res..

[12]  Subhash C. Narula,et al.  Multi-Project Scheduling: Analysis of Project Performance , 1985 .

[13]  Philip M. Wolfe,et al.  Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach , 1969 .

[14]  J. D. Wiest,et al.  A Heuristic Model for Scheduling Large Projects with Limited Resources , 1967 .

[15]  Joseph J. Moder,et al.  Project Management With Cpm, Pert and Precedence Diagramming , 1983 .

[16]  Godwin C. Ovuworie Introduction to Operations Research Techniques , 1978 .

[17]  Edward W. Davis CPM Use in Top 400 Construction Firms , 1974 .