Performance evaluation and energy production optimization in the real-time operation of hydropower plants

Abstract This paper describes a system for the performance evaluation and energy optimization of the real-time operation at Ita Hydropower Plant, which is located in southern Brazil. Using data collected from sensors and meters, several variables of the units are precisely calculated, such as turbined outflows, heads, losses and efficiencies. The unit turbined outflow, which is the most challenging and important parameter for real-time operation, is calculated using an ultrasonic flow meter and a Hill diagram. Additionally, the system performs a real-time optimization in which the dispatch aims to use the water efficiently. In predominant hydropower systems, as in Brazil, this computational tool is very useful for the efficient use of hydro resources, for which every tenth of a percentage increase in the energy conversion efficiency is welcome. The benefits detailed in this paper can also be achieved in other plants, particularly if there are a large number of units with distinct operating characteristics.

[1]  M. L. Santos,et al.  Practical aspects in solving the medium-term operation planning problem of hydrothermal power systems by using the progressive hedging method , 2009 .

[2]  Erlon Cristian Finardi,et al.  Unit commitment of single hydroelectric plant , 2005 .

[3]  Erlon Cristian Finardi,et al.  Parallel Processing Applied to the Planning of Hydrothermal Systems , 2003, IEEE Trans. Parallel Distributed Syst..

[4]  M. Pereira Optimal stochastic operations scheduling of large hydroelectric systems , 1989 .

[5]  F. J. Heredia,et al.  Optimum short-term hydrothermal scheduling with spinning reserve through network flows , 1995 .

[6]  Michèle Breton,et al.  A decomposition approach for the solution of the unit loading problem in hydroplants , 2002, Autom..

[7]  Z. K. Shawwash,et al.  A Practical Hydro, Dynamic Unit Commitment and Loading Model , 2001, IEEE Power Engineering Review.

[8]  Erlon Cristian Finardi,et al.  Hydro unit commitment and loading problem for day-ahead operation planning problem , 2013 .

[9]  Francisco D. Galiana,et al.  Systems to optimise conversion efficiencies at Ontario Hydro's hydroelectric plants , 1997 .

[10]  C. Sagastizábal,et al.  Solving the unit commitment problem of hydropower plants via Lagrangian Relaxation and Sequential Quadratic Programming , 2005 .

[11]  Edson C Bortoni,et al.  Optimal load distribution between units in a power plant. , 2007, ISA transactions.

[12]  E.L. da Silva,et al.  Solving the hydro unit commitment problem via dual decomposition and sequential quadratic programming , 2006, IEEE Transactions on Power Systems.

[13]  Erlon Cristian Finardi,et al.  A computational study of a stochastic optimization model for long term hydrothermal scheduling , 2012 .