Quantitative risk management in gas injection project: a case study from Oman oil and gas industry

The purpose of this research was to study the recognition, application and quantification of the risks associated in managing projects. In this research, the management of risks in an oil and gas project is studied and implemented within a case company in Oman. In this study, at first, the qualitative data related to risks in the project were identified through field visits and extensive interviews. These data were then translated into numerical values based on the expert’s opinion. Further, the numerical data were used as an input to Monte Carlo simulation. RiskyProject Professional™ software was used to simulate the system based on the identified risks. The simulation result predicted a delay of about 2 years as a worse case with no chance of meeting the project’s on stream date. Also, it has predicted 8% chance of exceeding the total estimated budget. The result of numerical analysis from the proposed model is validated by comparing it with the result of qualitative analysis, which was obtained through discussion with various project managers of company.

[1]  Juite Wang,et al.  A performance-oriented risk management framework for innovative R&D projects , 2010 .

[2]  D. Vose Risk Analysis: A Quantitative Guide , 2000 .

[3]  Ram Ganeshan,et al.  Using risk-management tools on B2Bs: An exploratory investigation , 2007 .

[4]  Jan Erik Vinnem,et al.  On the use of risk acceptance criteria in the offshore oil and gas industry , 2005, Reliab. Eng. Syst. Saf..

[5]  Kim Wikström,et al.  Defining uncertainty in projects – a new perspective , 2008 .

[6]  Kent D. Miller A Framework for Integrated Risk Management in International Business , 1992 .

[7]  Sara Marcelino-Sádaba,et al.  Project risk management methodology for small firms , 2014 .

[8]  Remi Jouandou,et al.  Dealing with Uncertainty: Selecting a Risk-Analysis Tool on the Basis of Project Characteristics and Phases , 2010 .

[9]  Jui-Sheng Chou,et al.  Cost simulation in an item-based project involving construction engineering and management , 2011 .

[10]  Tzvi Raz,et al.  Use and benefits of tools for project risk management , 2001 .

[11]  Ali Jaafari,et al.  Management of risks, uncertainties and opportunities on projects: time for a fundamental shift , 2001 .

[12]  Using game theory approach to interpret stable policies for Iran’s oil and gas common resources conflicts with Iraq and Qatar , 2015 .

[13]  Tony Waters,et al.  Environmental hazards: Assessing risk and reducing disaster , 1997 .

[14]  Alexander Verbraeck,et al.  Grasping project complexity in large engineering projects: The TOE (Technical, Organizational and Environmental) framework , 2011 .

[15]  Baba Md Deros,et al.  Maintenance management system for upstream operations in oil and gas industry: a case study , 2009 .

[16]  Xuejie Zhang,et al.  Information Security Risk Management Framework for the Cloud Computing Environments , 2010, 2010 10th IEEE International Conference on Computer and Information Technology.

[17]  Zsolt P. Komlosi Application: Monte Carlo Simulation in Risk Evaluation of E&P Projects , 2001 .

[18]  J. R. Jadhav,et al.  Risk management in medical product development process using traditional FMEA and fuzzy linguistic approach: a case study , 2015 .

[19]  K. Neailey,et al.  A Risk Register Database System to aid the management of project risk , 2002 .

[20]  Irem Dikmen,et al.  A knowledge-based risk mapping tool for cost estimation of international construction projects , 2014 .

[21]  R. Narasimhan,et al.  Perspectives on risk management in supply chains , 2009 .

[22]  Kent D. Miller,et al.  Scenarios, Real Options and Integrated Risk Management , 2003 .

[23]  Tiffany Lorraine Lewis Quantitative approach to technical performance measurement and technical risk analysis utilizing Bayesian methods and Monte Carlo simulation , 2010 .

[24]  Chris Chapman,et al.  Transforming project risk management into project uncertainty management , 2003 .

[25]  Mehran Khalaj,et al.  A novel risk-based analysis for the production system under epistemic uncertainty , 2013 .

[26]  M. Giannakis,et al.  A multi-agent based framework for supply chain risk management , 2011 .

[27]  Karlos Artto,et al.  Subcontractors' business relationships as risk sources in project networks , 2008 .

[28]  Keely L. Croxton,et al.  ENSURING SUPPLY CHAIN RESILIENCE: DEVELOPMENT OF A CONCEPTUAL FRAMEWORK , 2010 .

[29]  Saad Saeed,et al.  The Relationship Between Petroleum Economics and Risk Analysis: A New Integrated Approach for Project Management , 2004 .

[30]  Chris Chapman,et al.  Managing Project Risk and Uncertainty: A Constructively Simple Approach to Decision Making , 2002 .

[31]  M. Dulaimi,et al.  Risk management framework for construction projects in developing countries , 2004 .

[32]  Joseph H. M. Tah,et al.  Towards a framework for project risk knowledge management in the construction supply chain , 2001 .

[33]  Kevin McCormack,et al.  Supply Chain Risk in Turbulent Environments – A Conceptual Model for Managing Supply Chain Network Risk , 2009 .

[34]  Denis José Schiozer,et al.  Risk Analysis Applied To Petroleum Exploration And Production: An Overview , 2004 .

[35]  T. T. Narendran,et al.  RBG risk scale: an integrated tool for ergonomic risk assessments , 2011 .

[36]  Christian Kirchsteiger On the use of probabilistic and deterministic methods in risk analysis , 1999 .

[37]  C. Sheu,et al.  Choosing a project risk-handling strategy: An analytical model , 2008 .

[38]  J. U. M. Smith,et al.  Project Risk Management: Processes, Techniques and Insights , 1998, J. Oper. Res. Soc..

[39]  Alain Pinsonneault,et al.  Survey Research Methodology in Management Information Systems: An Assessment , 1993, J. Manag. Inf. Syst..

[40]  W. Duncan A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE , 1996 .

[41]  Terje Aven,et al.  A framework for reliability and risk centered maintenance , 2011, Reliab. Eng. Syst. Saf..

[42]  Lynda M. Bourne,et al.  Project Relationship Management and the Stakeholder Circle , 2010 .

[43]  C. Baier Project Risk Management Processes Techniques And Insights , 2016 .

[44]  Richard E. Westney Managing the Cost & Schedule Risk of Offshore Development Projects , 2001 .

[45]  T. Papadopoulos,et al.  Supply chain sustainability: A risk management approach , 2016 .

[46]  Denis Thuillier,et al.  Project management in the international development industry , 2010 .

[47]  Samer Al Hawari,et al.  Knowledge-Based Risk Management framework for Information Technology project , 2012, Int. J. Inf. Manag..

[48]  Sarah S. Lam,et al.  A fuzzy-based integrated framework for supply chain risk assessment , 2015 .

[49]  Kent D. Miller,et al.  Strategic Risk and Corporate Performance: an Analysis of Alternative Risk Measures , 1990 .

[50]  Sofia Ramos,et al.  Risk factors in oil and gas industry returns: International evidence , 2011 .

[51]  Pantaleo Mutajwaa Daniel Rwelamila,et al.  Risk management in IT projects – a case of the South African public sector , 2016 .