Optimization of overlapping activities in the design phase of construction projects
暂无分享,去创建一个
[1] Christoph H. Loch,et al. Exchanging Preliminary Information in Concurrent Engineering: Alternative Coordination Strategies , 2002, Organ. Sci..
[2] Tarek Hegazy. Optimization of construction time-cost trade-off analysis using genetic algorithms , 1999 .
[3] Keith R. Molenaar,et al. Strategies for overlapping dependent design activities , 2006 .
[4] HaziniKamran,et al. A heuristic method to determine optimum degree of activity accelerating and overlapping in schedule compression , 2013 .
[5] Viswanathan V Krishnan,et al. Managing the simultaneous execution of coupled phases in concurrent product development , 1996 .
[6] Feniosky Peña-Mora,et al. DYNAMIC PLANNING AND CONTROL METHODOLOGY FOR DESIGN/BUILD FAST-TRACK CONSTRUCTION PROJECTS , 2001 .
[7] Christoph H. Loch,et al. Communication and Uncertainty in Concurrent Engineering , 1998 .
[8] Raad Yahya Qassim,et al. Project Acceleration via Activity Crashing, Overlapping, and Substitution , 2008, IEEE Transactions on Engineering Management.
[9] Makarand Hastak,et al. Time and Cost-Optimized Decision Support Model for Fast-Track Projects , 2013 .
[10] Steven D. Eppinger,et al. Accelerating Product Development by the Exchange of Preliminary Product Design Information , 1995 .
[11] Fabio Nicolò,et al. A concurrent engineering decision model: Management of the project activities information flows , 1998 .
[12] Ali A. Yassine,et al. An optimization-based model for maximizing the benefits of fast-track construction activities , 2013, J. Oper. Res. Soc..
[13] Keith R. Molenaar,et al. Concurrent Engineering Approach to Reducing Design Delivery Time , 2005 .
[14] Keith R. Molenaar,et al. Simulation of Overlapping Design Activities in Concurrent Engineering , 2011 .
[15] Reza H. Ahmadi,et al. Time-Cost Trade-Offs in Overlapped Product Development , 2000, Oper. Res..
[16] Issam Srour,et al. A methodology for scheduling overlapped design activities based on dependency information , 2013 .
[17] David E. Goldberg,et al. Genetic Algorithms in Search Optimization and Machine Learning , 1988 .
[18] Steven D. Eppinger,et al. A Model-Based Framework to Overlap Product Development Activities , 1997 .
[19] Kok Lay Teo,et al. A review of methods and algorithms for optimizing construction scheduling , 2013, J. Oper. Res. Soc..
[20] Mohan M. Kumaraswamy,et al. Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization , 2004 .
[21] Chung-Wei Feng,et al. Using genetic algorithms to solve construction time-cost trade-off problems , 1997 .
[22] Reza H. Ahmadi,et al. Concurrent Crashing and Overlapping in Product Development , 2004, Oper. Res..
[23] Reza Dehghan,et al. Model of Trade-Off between Overlapping and Rework of Design Activities , 2014 .
[24] Evan L. Porteus,et al. Optimal Timing of Reviews in Concurrent Design for Manufacturability , 1995 .
[25] Reza Dehghan. A new model, algorithm and computer tool to optimize overlapping of design activities in construction projects , 2011 .
[26] David K. H. Chua,et al. Overlapping design and construction activities and an optimization approach to minimize rework , 2014 .
[27] Janaka Y. Ruwanpura,et al. Optimum Activity Overlapping using Genetic Algorithms , 2011, ISEC 2011.
[28] J. Y. Ruwanpura,et al. The Mechanism of Design Activity Overlapping in Construction Projects and the Time-Cost Tradeoff Function , 2011 .
[29] Keith R. Molenaar,et al. Sensitivity of Construction Activities under Design Uncertainty , 2009 .
[30] Eiichi Gotoh,et al. CONSTRUCTION ENGINEERING AND MANAGEMENT , 1991 .
[31] Robert Pellerin,et al. Time-cost trade-offs in resource-constraint project scheduling problems with overlapping modes , 2014 .