Severe accident analysis for a typical PWR using the MELCOR code
暂无分享,去创建一个
Longze Li | Wenxi Tian | Guanghui Su | Suizheng Qiu | Mingjun Wang | G. Su | S. Qiu | W. Tian | Mingjun Wang | Longze Li
[1] Wenxi Tian,et al. Research on the designed emergency passive residual heat removal system during the station blackout scenario for CPR1000 , 2012 .
[2] B. Atanasova,et al. VVER 1000 SBO calculations with pressuriser relief valve stuck open with ASTEC computer code , 2012 .
[3] Karen Vierow,et al. Severe accident analysis of a PWR station blackout with the MELCOR, MAAP4 and SCDAP/RELAP5 codes , 2004 .
[4] Francesco Saverio D'Auria,et al. Application of an optimized AM procedure following a SBO in a VVER-1000 , 2008 .
[5] Su Guanghui. Transient Analyses of Station Blackout Accident for CPR1000 , 2011 .
[6] H. S. Kushwaha,et al. Analyses for VVER-1000/320 reactor for spectrum of break sizes along with SBO , 2010 .
[7] Goon-Cherl Park,et al. Optimum RCS depressurization strategy for effective severe accident management of station black out accident , 2009 .
[8] K. Zhang,et al. Evaluation of intentional depressurization strategy in Chinese 600 MWe PWR NPP , 2008 .