Adoption of six-sigma concept in New Product Development: a literature survey and analysis

During recent years, many researchers and practitioners are largely concentrating on New Product Development (NPD). Owing to the absence of data on past performance history, achieving quality and reliability in NPD process has been a challenge. This paper reports a literature survey conducted in this context to identify a method for linking NPD, Total Quality Management (TQM), Reliability and six-sigma programmes. This paper reveals that a few techniques and tools are commonly used in these programmes. These common tools and techniques, which form the links to achieve quality and reliability continuously in NPD process, are to be integrated with the pillars of six-sigma concept. The paper concludes by claiming that the development of a model using these links will help in the achievement of quality and reliability continuously in NPD process.

[1]  Naser A. Alsaleh,et al.  Application of quality tools by the Saudi food industry , 2007 .

[2]  Oscar F. Bustinza,et al.  Six Sigma: From a Goal-Theoretic Perspective to Shared-Vision Development , 2009 .

[3]  Juan José Tarí,et al.  Quality tools and techniques: Are they necessary for quality management? , 2004 .

[4]  James Prendergast,et al.  Building‐in reliability ‐ implementation and benefits , 1996 .

[5]  Andrew Thomas,et al.  Developing an SME based six sigma strategy , 2006 .

[6]  G. Lantos,et al.  New product development: an overlooked but critical course , 2009 .

[7]  Pauline Found,et al.  Towards lean product lifecycle management: A framework for new product development , 2006 .

[8]  Peter F. Kaminski,et al.  New product development: using the salesforce to identify opportunities , 1997 .

[9]  Zhihai Zhang Application of experimental design in new product development , 1998 .

[10]  Chee-Cheng Chen,et al.  Customer-focused and product-line-based manufacturing performance measurement , 2007 .

[11]  Edward D. Arnheiter,et al.  The integration of lean management and Six Sigma , 2005 .

[12]  R. Hunt,et al.  New product development projects and project manager skill sets in the telecommunications industry , 2009 .

[13]  Joao S. Neves,et al.  The challenges of six sigma in improving service quality , 2009 .

[14]  J. Antony Six Sigma vs TQM: some perspectives from leading practitioners and academics , 2009 .

[15]  R. Andersson,et al.  Similarities and differences between TQM, six sigma and lean , 2006 .

[16]  John Morrow,et al.  Improving self service the six sigma way at Newcastle University Library , 2006, Program.

[17]  K. Sivakumar,et al.  Designing global new product teams , 2003 .

[18]  Kean C. Aw Integrating quality and reliability assessment into product development process , 2005 .

[19]  J. Antony,et al.  A business process change framework for examining the implementation of six sigma: a case study of Dow Chemicals , 2004 .

[20]  F. Franzak,et al.  Redefining new product development teams: learning to actualize consumer contributions , 1996 .

[21]  Cornelia Dröge,et al.  Boundary spanning interfaces between logistics, production, marketing and new product development , 1996 .

[22]  H. Moon,et al.  A new framework for global expansion , 2008 .

[23]  H. Maylor Concurrent new product development: an empirical assessment , 1997 .

[24]  Uma Kumar,et al.  Performance measurement by TQM adopters , 2007 .

[25]  Nicholas Chileshe,et al.  Quality management concepts, principles, tools and philosophies , 2007 .

[26]  Michael J. Howley,et al.  The role of consultancies in new product development , 2002 .

[27]  Mei Cao,et al.  Innovation-driven learning in new product development: a conceptual model , 2004, Ind. Manag. Data Syst..

[28]  Ravi Shankar,et al.  Soft-system knowledge management framework for new product development , 2009, J. Knowl. Manag..

[29]  Maneesh Kumar,et al.  Six sigma in service organisations: Benefits, challenges and difficulties, common myths, empirical observations and success factors , 2007 .

[30]  Frank M. Gryna,et al.  Juran's Quality Planning and Analysis for Enterprise Quality , 2005 .

[31]  Natcha Thawesaengskulthai,et al.  Pay‐off selection criteria for quality and improvement initiatives , 2008 .

[32]  Eamonn Murphy,et al.  Simulation and comparison of reliability growth models , 2002 .

[33]  S. R. Devadasan,et al.  Total agile design system model via literature exploration , 2009, Ind. Manag. Data Syst..

[34]  Stefan Lagrosen,et al.  The effects of quality management – a survey of Swedish quality professionals , 2005 .

[35]  John Man,et al.  Six sigma and lifelong learning , 2002 .

[36]  Halit Keskin,et al.  Accelerated Learning in New Product Development Teams , 2003 .

[37]  Jiju Antony,et al.  Confluence of six sigma, simulation and software development , 2005 .

[38]  Douglas J. Ayers,et al.  New product development practices in consumer versus business products organizations , 1995 .

[39]  Bob Stephens Implementation of ISO 9000 or Ford’s Q1 Award: effects on organizational knowledge and application of TQM principles and quality tools , 1997 .

[40]  Walid Y. Thabet,et al.  Understanding the role of developer/builders in the concurrent commercialization of product innovation , 2009 .

[41]  Joseph Moses Juran,et al.  Quality Planning and Analysis: From Product Development Through Usage , 1982 .

[42]  Serdar S. Durmusoglu,et al.  The role of top management team's information technology (IT) infrastructure view on new product development: Conceptualizing IT infrastructure capability as a mediator , 2009 .

[43]  C. Lackman,et al.  Organizational learning: a critical component to new product development , 2000 .

[44]  Jung‐Lang Cheng,et al.  Implementing Six Sigma via TQM improvement: an empirical study in Taiwan , 2008 .

[45]  Jiju Antony,et al.  Can Six Sigma be effectively implemented in SMEs , 2008 .

[46]  Taho Yang,et al.  Six-Sigma Project Selection Using National Quality Award Criteria and Fuzzy Multiple Criteria Decision-Making Method , 2008, 2008 4th International Conference on Wireless Communications, Networking and Mobile Computing.

[47]  Francisco Tamayo Enríquez,et al.  TQM and QFD: exploiting a customer complaint management system , 2005 .

[48]  William J. Doll,et al.  The role of heavyweight product manager in new product development , 2008 .

[49]  Sarah Ingle,et al.  Six sigma black belt implementation , 2001 .

[50]  Zahidul Islam,et al.  Team learning, top management support and new product development success , 2009 .

[51]  R. Balachandra,et al.  An expert system for new product development projects , 2000 .

[52]  Thong Ngee Goh,et al.  Six Sigma in software quality , 2003 .

[53]  Ming-Lu Wu,et al.  Quality function deployment: A literature review , 2002, Eur. J. Oper. Res..

[54]  L. David Weller,et al.  Benchmarking: a paradigm for change to quality education , 1996 .

[55]  Nalina Suresh,et al.  A software reliability growth model , 1996 .

[56]  Jens J. Dahlgaard,et al.  Implementing statistical process control : An organizational perspective , 2008 .

[57]  Jiju Antony,et al.  Is six sigma a management fad or fact , 2007 .

[58]  B. Klefsjö,et al.  TQM as a management system consisting of values, techniques and tools , 2000 .

[59]  Jiju Antony,et al.  Key ingredients for the effective implementation of Six Sigma program , 2002 .

[60]  Daniel I. Prajogo,et al.  The relationship between competitive strategies and product quality , 2007, Ind. Manag. Data Syst..

[61]  Tsun-jin Chang,et al.  The effects of joint reward system in new product development , 2007 .

[62]  Xingxing Zu,et al.  Infrastructure and core quality management practices: how do they affect quality? , 2009 .

[63]  Christian N. Madu,et al.  Strategic value of reliability and maintainability management , 2005 .

[64]  Jens J. Dahlgaard,et al.  The value of quality improvements , 2008 .

[65]  Dennis A. Pitta,et al.  Innovations in new product development at Universal Pipe and Fittings , 2006 .

[66]  K. Ooi,et al.  TQM practices and quality management performance , 2008 .

[67]  Marcello Braglia,et al.  The house of reliability , 2007 .

[68]  C. Voss,et al.  Quality management re-visited: a reflective review and agenda for future research , 2002 .

[69]  Sandra Valle,et al.  Cross‐functionality and leadership of the new product development teams , 2003 .

[70]  Michael J. Baker,et al.  The Multiple Convergent Processing Model of New Product Development , 1994 .

[71]  Thong Ngee Goh,et al.  Improving on the six sigma paradigm , 2004 .

[72]  J. Antony What is the role of academic institutions for the future development of Six Sigma , 2007 .

[73]  Qingyu Zhang,et al.  The fuzzy front end and success of new product development: a causal model , 2001 .

[74]  Evangelos Psomas,et al.  The impact of “soft” and “hard” TQM elements on quality management results , 2009 .

[75]  Paulo Augusto Cauchick Miguel,et al.  Failure mode and effects analysis (FMEA) in the context of risk management in new product development: A case study in an automotive company , 2008 .

[76]  J. Tarí Components of successful total quality management , 2005 .

[77]  Dennis Pitta Selection as a new product development process: the case of Vertical Branding, Inc. , 2007 .

[78]  Haritha Saranga,et al.  Six sigma project selection using data envelopment analysis , 2007 .

[79]  Dennis A. Pitta Product innovation and management in a small enterprise , 2008 .

[80]  James A. Sena,et al.  Knowledge management and new product development: a study of two companies , 2003 .

[81]  John H. Heinrichs,et al.  Strategic impact of new product development on export involvement , 2006 .

[82]  G. Booysen,et al.  Rapid tooling in support of accelerated new product development , 2005 .

[83]  Mahesh S. Raisinghani,et al.  Six Sigma: concepts, tools, and applications , 2005, Ind. Manag. Data Syst..

[84]  L. Fredendall,et al.  Mapping the critical links between organizational culture and TQM/Six Sigma practices , 2010 .

[85]  Marvin E. Gonzalez,et al.  Designing a supply chain management academic curriculum using QFD and benchmarking , 2008 .

[86]  Borut Mavko,et al.  Application of the fault tree analysis for assessment of power system reliability , 2009, Reliab. Eng. Syst. Saf..

[87]  Dale Littler,et al.  Reflecting practice: The case of marketing and new product development , 2006 .

[88]  M. Terziovski,et al.  The relationship between total quality management practices and operational performance , 1999 .

[89]  M. Bergfors,et al.  Product and process innovation in process industry: a new perspective on development , 2009 .

[90]  S. Brah,et al.  Understanding the benchmarking process in Singapore , 2000 .

[91]  P. Herbig,et al.  Global markets and the new product development process , 1996 .

[92]  Kung‐Jeng Wang,et al.  Performance evaluation of resource allocation strategies for new product development under different workload scenarios , 2009 .

[93]  Eric Brun,et al.  Classification of ambiguity in new product development projects , 2009 .

[94]  Elena Revilla,et al.  Information Technology as Knowledge Management Enabler in Product Development - An Empirical Evidence , 2007 .

[95]  Ruud T. Frambach,et al.  Market research companies and new product development tools , 1998 .

[96]  James T. Simpson,et al.  New product development in German and US technology firms , 2002 .

[97]  Jiju Antony,et al.  Assessing the status of six sigma implementation in the Indian industry: Results from an exploratory empirical study , 2009 .

[98]  Jiju Antony,et al.  Six sigma for service processes , 2006, Bus. Process. Manag. J..

[99]  Uche Nwabueze An industry betrayed: the case of total quality management in manufacturing , 2001 .

[100]  Roger J. Calantone,et al.  An exploration of organizational factors in new product development success , 2006 .

[101]  Hanne Harmsen,et al.  Implementation of success factors in new product development – the missing links? , 2001 .

[102]  Josim U. Ahmed Modern approaches to product reliability improvement , 1996 .

[103]  Jamshed Siddiqui,et al.  TQM principles' application on information systems for empirical goals , 2007 .

[104]  Roger J. Calantone,et al.  Is more information technology better for new product development , 2006 .

[105]  S. Hart,et al.  Where to Now in New Product Development Research , 1992 .

[106]  Jeroen de Mast,et al.  A rational reconstruction of Six Sigma's Breakthrough Cookbook , 2006 .

[107]  Inderpreet Singh Ahuja,et al.  Assessment of contributions of successful TPM initiatives towards competitive manufacturing , 2008 .

[108]  Christian N. Madu,et al.  Customer‐centric six sigma quality and reliability management , 2003 .

[109]  Simon Mosey,et al.  New product development in British SMEs , 2000 .

[110]  Mahmoud M. Yasin,et al.  TQM practices in service organizations: an exploratory study into the implementation, outcome and effectiveness , 2004 .

[111]  L. David Weller,et al.  School attendance problems: using the TQM tools to identify root causes , 2000 .

[112]  Dag Näslund,et al.  Lean, six sigma and lean sigma: fads or real process improvement methods? , 2008, Bus. Process. Manag. J..

[113]  Seokjin Kim,et al.  The dynamics of quality costs in continuous improvement , 2008 .

[114]  S. Paliwoda,et al.  Globalisation through the kaleidoscope , 2009 .

[115]  Rambabu Kodali,et al.  TQM implementation elements for manufacturing excellence , 2008 .

[116]  Angel Martínez‐Sánchez,et al.  Teleworking and new product development , 2006 .

[117]  Yi‐Ping Chang,et al.  An alternative reliability evaluation of non‐homogeneous Poisson process models for software reliability , 2000 .

[118]  Huw Millward,et al.  Barriers to successful new product development within small manufacturing companies , 2005 .

[119]  Richard G. Mathieu,et al.  Supporting new product development with the Internet , 2000, Ind. Manag. Data Syst..

[120]  Francisco Javier Miranda González,et al.  Assessing the validity of new product development techniques in Spanish firms , 2002 .

[121]  S.M.A. Suliman,et al.  Integrating Six‐Sigma with other reliability improvement methods in equipment reliability and maintenance applications , 2008 .

[122]  Marly Monteiro de Carvalho,et al.  Main quality programs characteristics in large size Brazilian companies , 2008 .

[123]  Bhuiyan Nadia,et al.  Engineering change request management in a new product development process , 2006 .

[124]  Harvey Maylor,et al.  The reality of concurrent new product development , 1998 .

[125]  Les Tien-Shang Lee,et al.  The effects of team reflexivity and innovativeness on new product development performance , 2008, Ind. Manag. Data Syst..

[126]  George A. Bohoris Trend testing in reliability engineering , 1996 .

[127]  Rick L. Edgeman,et al.  Six sigma seen as a methodology for total quality management , 2001 .

[128]  Zhiwei Zhu,et al.  TQM success efforts: use more quantitative or qualitative tools? , 1997 .

[129]  Yan Xin,et al.  An exploratory study of the use of quality tools and techniques in product development , 2005 .

[130]  Jiju Antony,et al.  Critical success factors for the successful implementation of six sigma projects in organisations , 2002 .

[131]  Elisa Fredericks,et al.  Cross‐functional involvement in new product development , 2005 .

[132]  Ali E. Akgün,et al.  New product development team improvisation and speed‐to‐market: an extended model , 2002 .