FLEAS: a flowline environment for automated supervision
暂无分享,去创建一个
[1] Hector J. Levesque,et al. A New Method for Solving Hard Satisfiability Problems , 1992, AAAI.
[2] G. Rand. Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop , 1982 .
[3] G. Fozzard,et al. Constraint-Based Reactive Rescheduling in a Stochastic Environment , 1997, ECP.
[4] David A. McAllester,et al. GSAT and Dynamic Backtracking , 1994, KR.
[5] Steven Minton,et al. Solving Large-Scale Constraint-Satisfaction and Scheduling Problems Using a Heuristic Repair Method , 1990, AAAI.
[6] D. J. Tyler. THE DEVELOPMENT PHASE OF THE TEXTILE/CLOTHING TECHNOLOGY CORPORATION APPAREL AUTOMATION PROJECT , 1989 .
[7] Gerry Kelleher,et al. A Discipline for Reactive Rescheduling , 1996, AIPS.