An Interval-Parameter Based Two-Stage Stochastic Programming for Regional Electric Power Allocation

Electricity has become an indispensable part of human being’s life. In China, regional electric power allocation, involving multiple groups who pursue the biggest social benefit, has been facing some serious problems and raising people’s more and more concern. In this paper, an interval-parameter based two-stage stochastic model is built to solve the problem of planning of electric power allocation target in the perspective of the State Grid Corporation. In the model, the interval-parameter is used to deal with uncertainty of the problem and the two-stage decision making helps take corrective actions after a random events occurs. The application of the model was demonstrated efficiency and practicality with the case study in real world. Combining models proposed in this paper with some related policy implications, it is useful in improving actual operation and helping better decision.

[1]  Chandan Kumar Chanda,et al.  Strategic approach for reinforcement of intermittent renewable energy sources and capacitor bank for sustainable electric power distribution system , 2016 .

[2]  Takayuki Ito,et al.  A Preliminary Experimental Analysis on Combinatorial Auction-Based Electric Power Allocation for Manufacturing Industries , 2012, 2012 IEEE/WIC/ACM International Conferences on Web Intelligence and Intelligent Agent Technology.

[3]  Zhang Li-qing Research and Application of Technologies in Energy-Saving,Emission-Reducing and Optimal Resource Allocation of Electric Power System , 2007 .

[4]  G. H. Huang,et al.  A hybrid inexact-stochastic water management model , 1998, Eur. J. Oper. Res..

[5]  Guohe Huang,et al.  An interval-parameter two-stage stochastic fuzzy program with type-2 membership functions: an application to water resources management , 2013, Stochastic Environmental Research and Risk Assessment.

[6]  Shuo Wang,et al.  A multi-level Taguchi-factorial two-stage stochastic programming approach for characterization of parameter uncertainties and their interactions: An application to water resources management , 2015, Eur. J. Oper. Res..

[7]  John R. Birge,et al.  Introduction to Stochastic Programming , 1997 .

[8]  Guohe Huang,et al.  A copula-based fuzzy chance-constrained programming model and its application to electric power generation systems planning , 2017 .

[9]  Ahmad Rezaee Jordehi,et al.  Allocation of distributed generation units in electric power systems: A review , 2016 .

[10]  Hiroshi Suzuki,et al.  Practical reactive power allocation/operation planning using successive linear programming , 1988 .

[11]  Guo H. Huang,et al.  An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty , 2005, Eur. J. Oper. Res..

[12]  Yan Li,et al.  Municipal Solid Waste Management under Uncertainty: An Interval-Fuzzy Two-Stage Stochastic Programming Approach , 2008 .