A simulation study of despatch bay performance in the steel processing industry
暂无分享,去创建一个
[1] Elwood S. Buffa,et al. A Heuristic Algorithm and Simulation Approach to Relative Location of Facilities , 1963 .
[2] Chandra Lalwani,et al. Developing a methodology to analyse despatch bay performance , 2007 .
[3] Adrie J. M. Beulens,et al. Simulation model of multi-compartment distribution in the catering supply chain , 1998, Eur. J. Oper. Res..
[4] John Golias,et al. Towards the improvement of a combined transport chain performance , 2004, Eur. J. Oper. Res..
[5] Glen L. Urban. Building Models for Decision Makers , 1974 .
[6] Jack P. C. Kleijnen. Supply Chain Simulation : A Survey , 2003 .
[7] Andrew Greasley. Simulation Modelling for Business , 2003 .
[8] Paul Morris. Streamlining Your Shipping and Despatch , 1991 .
[9] R. D. Wright,et al. On the Effectiveness of Common Random Numbers , 1979 .
[10] G. Fozzard,et al. Simulation of flow lines in clothing manufacture. Part 1: model construction , 1996 .
[11] Alexander Verbraeck,et al. Integrating the Conceptualization and Simulation of Business Processes: A Modeling Method and Arena Template , 2003, Simul..
[12] Randall P. Sadowski,et al. Simulation with Arena , 1998 .
[13] Timothy L. Smunt,et al. Empirical simulation studies in operations management: context, trends, and research opportunities , 2004 .
[14] I-Cheng Yeh. Construction-Site Layout Using Annealed Neural Network , 1995 .
[15] C. West Churchman,et al. Reliability of Models in the Social Sciences , 1973 .
[16] Nashwan Dawood,et al. Stockyard layout planning and management for the precast concrete products industry , 2001 .
[17] M. Naim,et al. Assessing the impact of e-business on supply chain dynamics , 2004 .
[18] Akira Tsurushima,et al. An expert system using priorities for solving multiple-criteria facility layout problems , 1989 .
[19] J. Banks,et al. Handbook of Simulation , 1998 .
[20] Ruth Sara Aguilar-Savén,et al. Business process modelling: Review and framework , 2004 .
[21] R. Boughton,et al. ADDRESSING THE ESCALATING COST OF ROAD TRANSPORT , 2003 .
[22] Yun Bae Kim,et al. Supply chain simulation with discrete-continuous combined modeling , 2002 .
[23] Trevor A Spedding,et al. Application of discrete event simulation to the activity based costing of manufacturing systems , 1999 .
[24] Scott J. Mason,et al. INTEGRATING THE WAREHOUSING AND TRANSPORTATION FUNCTIONS OF THE SUPPLY CHAIN , 2003 .
[25] John D. Sterman,et al. System Dynamics: Systems Thinking and Modeling for a Complex World , 2002 .
[26] Steve Buckley,et al. Panel session: opportunities for simulation in supply chain management , 2002, Proceedings of the Winter Simulation Conference.
[27] W. Edward Back,et al. Monte Carlo Simulation as Tool for Process Reengineering , 1995 .
[28] C. John Langley,et al. Management of Business Logistics: A Supply Chain Perspective , 2002 .
[29] Peter E.D. Love,et al. Re‐engineering manufacturing processes through simulation modelling , 2000 .
[30] Muhittin Oral,et al. The facets of the modeling and validation process in operations research , 1993 .
[31] James F. Cox,et al. Multiple criteria approach to the facilities layout problem , 1985 .
[32] Jerry Banks,et al. Principles of Simulation , 2007, Introduction to Stochastic Processes and Simulation.
[33] Razman Mat Tahar,et al. Simulation and analysis for the Kelang Container Terminal operations , 2000 .
[34] F. Persson,et al. Performance simulation of supply chain designs , 2002 .