Integrating system dynamics and fuzzy logic modelling for construction risk management

The complex structure of construction project risks arises from their internal and external interactions with their dynamic nature throughout the life cycle of the project. A system dynamics (SD) approach to construction project risk management is presented, including risk analysis and response process. Owing to the imprecise and uncertain nature of risks, fuzzy logic is integrated into system dynamics modelling structure. Risk magnitudes are defined by a fuzzy logic based risk magnitude prediction system. Zadeh's extension principle and interval arithmetic is employed in the SD simulation model to present the system outcomes considering uncertainties in the magnitude of risks resulting from the risk magnitude prediction system. The performance of the proposed method is assessed by employing the method in the risk management plan of a sample project. The impact of a sample risk is quantified and efficiency of different alternative response scenarios is assessed. The proposed approach supports different stages of the risk management process considering both the systemic and uncertain nature of risks.

[1]  J. Forrester Industrial Dynamics , 1997 .

[2]  Feniosky Peña-Mora,et al.  DYNAMIC PLANNING AND CONTROL METHODOLOGY FOR DESIGN/BUILD FAST-TRACK CONSTRUCTION PROJECTS , 2001 .

[3]  David Arditi,et al.  Managing Owner’s Risk of Contractor Default , 2005 .

[4]  David Picken,et al.  Using Risk Analysis to Determine Construction Project Contingencies , 2000 .

[5]  Ronald E. Giachetti,et al.  A parametric representation of fuzzy numbers and their arithmetic operators , 1997, Fuzzy Sets Syst..

[6]  David N. Ford Achieving Multiple Project Objectives through Contingency Management , 2002 .

[7]  F. S. Wong,et al.  Fuzzy weighted averages and implementation of the extension principle , 1987 .

[8]  Chien-Liang Lin,et al.  Contractor’s Opportunistic Bidding Behavior and Equilibrium Price Level in the Construction Market , 2007 .

[9]  Roger Flanagan,et al.  Risk Management and Construction , 1993 .

[10]  David N. Ford,et al.  Dynamic modeling of product development processes , 1998 .

[11]  Madan M. Gupta,et al.  Fuzzy mathematical models in engineering and management science , 1988 .

[12]  Seung Heon Han,et al.  Multicriteria Financial Portfolio Risk Management for International Projects , 2004 .

[13]  James E. Diekmann,et al.  Risk analysis: lessons from artificial intelligence , 1992 .

[14]  Hans-Jürgen Zimmermann,et al.  Fuzzy Set Theory - and Its Applications , 1985 .

[15]  Stuart D. Anderson,et al.  Managing Constructibility Reviews to Reduce Highway Project Durations , 2004 .

[16]  Robert L. K. Tiong,et al.  NPV-at-Risk Method in Infrastructure Project Investment Evaluation , 2000 .

[17]  Farnad Nasirzadeh,et al.  Dynamic risk analysis in construction projects , 2008 .

[18]  Fran Ackermann,et al.  Systemic risk assessment: a case study , 2007, J. Oper. Res. Soc..

[19]  Jamal F. Al‐Bahar,et al.  Systematic Risk Management Approach for Construction Projects , 1990 .

[20]  Seçkin Polat,et al.  Comparison of fuzzy and crisp systems via system dynamics simulation , 2002, Eur. J. Oper. Res..

[21]  Aminah Robinson Fayek,et al.  Fuzzy Numbers in Cost Range Estimating , 2007 .

[22]  Ruth Marzi,et al.  Application of system dynamics and fuzzy logic to forecasting of municipal solid waste , 2002, Math. Comput. Simul..

[23]  Alfredo del Caño,et al.  Integrated Methodology for Project Risk Management , 2002 .

[24]  Osama A. Jannadi,et al.  RISK ASSESSMENT IN CONSTRUCTION , 2003 .

[25]  Fran Ackermann,et al.  The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects , 2000, J. Oper. Res. Soc..

[26]  Johan Springael,et al.  Simulation with system dynamics and fuzzy reasoning of a tax policy to reduce CO2 emissions in the residential sector , 2008, Eur. J. Oper. Res..

[27]  Osama Moselhi Pricing Construction Risk: Fuzzy Set Application , 1995 .

[28]  Ali Touran,et al.  Probabilistic Model for Cost Contingency , 2003 .

[29]  Ebrahim H. Mamdani,et al.  An Experiment in Linguistic Synthesis with a Fuzzy Logic Controller , 1999, Int. J. Hum. Comput. Stud..

[30]  Moonseo Park,et al.  Quality and Change Management Model for Large Scale Concurrent Design and Construction Projects , 2005 .

[31]  George Ofori,et al.  Stimulating Construction Innovation in Singapore through the National System of Innovation , 2006 .

[32]  Stephen O. Ogunlana,et al.  Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling , 2001 .

[33]  Susan Howick,et al.  The impact of disruption and delay when compressing large projects: going for incentives? , 2001, J. Oper. Res. Soc..

[34]  Mitsuo Gen,et al.  An efficient approach for large scale project planning based on fuzzy Delphi method , 1995, Fuzzy Sets Syst..

[35]  Heng Li,et al.  System Dynamics Approach to Exploring Performance Enhancement in a Construction Organization , 2003 .

[36]  Feniosky Peña-Mora,et al.  Dynamic Planning for Fast-Tracking Building Construction Projects , 2001 .

[37]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[38]  Feniosky Peña-Mora,et al.  Dynamic change management for construction: introducing the change cycle into model‐based project management , 2003 .

[39]  Keith R. Molenaar,et al.  Programmatic Cost Risk Analysis for Highway Megaprojects , 2005 .

[40]  A. Touran,et al.  RANK CORRELATIONS IN SIMULATING CONSTRUCTION COSTS , 1997 .

[41]  W. Duncan A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE , 1996 .

[42]  Madan M. Gupta,et al.  Introduction to Fuzzy Arithmetic , 1991 .

[43]  Stephen O. Ogunlana,et al.  System dynamics modeling of design and build construction projects , 2002 .

[44]  J. Sterman Business Dynamics , 2000 .