Fabrication and Integrity Testing of a Korean ITER TBM FW Mock-Up in Preparation for High Heat Flux Test

Abstract Korea (KO) has developed and participated in the Test Blanket Module (TBM) program in the ITER, in which Ferritic Martensitic (FM) steel was used as the structural material for the TBM first wall (FW). To develop the fabrication method for the TBM FW and verify its integrity, a half-scale sub-module mock-up was fabricated and integrity test has been prepared; A dimension of it is a 444 mm height, 260 mm width, and 435 mm depth. A mock-up was assembled by HIPping of the previous fabricated components between the welded front and back plates, and then machining these plates to form the completed sub-module FW. To investigate the deformation of the cooling channels after the fabrication of the mock-up, neutron radiography was carried using neutron radiography facility. Pressure and He leak tests were successfully performed without any leak and failure. The flow rates in each channel were measured with the conventional ultrasonic sensor but it shows non-uniform flow distribution at each channel differently from the estimation by ANSYS-CFX. HHF test conditions were evaluated through the ANSYS-CFX analysis considering the above measured flow rates in each channel and it shows non-uniform temperature distribution of the FW mock-up. We will re-assemble or fabricate the manifold and perform the flow test before HHF test in the near future.

[1]  Dong Won Lee,et al.  Fabrication of a 1/6-Scale Mock-Up for the Korea TBM First Wall in ITER , 2012 .

[2]  Dong Won Lee,et al.  Fabrication and high heat flux test of large mockups for ITER first wall semi-prototype , 2011 .

[3]  Kenji Yokoyama,et al.  Thermo-hydraulic testing and integrity of ITER Test Blanket Module (TBM) First Wall mock-up in JAEA , 2010 .

[4]  Kenji Yokoyama,et al.  Progress of Design and R&D of Water Cooled Solid Breeder Test Blanket Module , 2009 .

[5]  J. Park,et al.  HIP joining of RAFM/RAFM steel and beryllium/RAFM steel for fabrication of the ITER TBM first wall , 2009 .

[6]  Dong Won Lee,et al.  High Heat Flux Test with HIP Bonded 50x50 Be/Cu Mock-Ups for the ITER First Wall , 2009 .

[7]  Mikio Enoeda,et al.  Development of water-cooled solid breeder test blanket module in JAEA , 2009 .

[8]  Bong Guen Hong,et al.  Fabrication and high heat flux test of the first wall mock-ups for the Korean He Cooled Test Blanket (KO HCML TBM) , 2009 .

[9]  Dong Won Lee,et al.  High heat flux test with HIP bonded Be/Cu mock-ups for the ITER first wall , 2008, 2009 23rd IEEE/NPSS Symposium on Fusion Engineering.

[10]  Bong Guen Hong,et al.  Design and preliminary safety analysis of a helium cooled molten lithium test blanket module for the ITER in Korea , 2008 .

[11]  Kyung Ho Yoon,et al.  Helium Cooled Molten Lithium TBM for the ITER in Korea , 2007 .

[12]  Dong Won Lee,et al.  Basic concepts of DEMO and a design of a helium-cooled molten lithium blanket for a testing in ITER , 2007 .

[13]  Kyung Ho Yoon,et al.  Preliminary design of a helium cooled molten lithium test blanket module for the ITER test in Korea , 2007 .