Batch splitting in an assembly scheduling environment
暂无分享,去创建一个
[1] Stephen C. Graves,et al. Overlapping operations in material requirements planning , 1986 .
[2] Rakesh Nagi,et al. Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups , 1997 .
[3] Stéphane Dauzère-Pérès,et al. Integration of lotsizing and scheduling decisions in a job-shop , 1994 .
[4] Serdar Yavuz,et al. Scheduling with Batching and Lot-sizing , 1999 .
[5] Gary L. Ragatz,et al. The impact of lot splitting on due date performance , 1994 .
[6] David F. Pyke,et al. Solution Procedures for the Lot‐Streaming Problem , 1990 .
[7] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[8] Rakesh Nagi,et al. Cycle time reduction by improved MRP-based production planning , 2000 .
[9] Rakesh Nagi,et al. 'Just-in-time' production of large assemblies , 1996 .
[10] J. K. Lenstra,et al. Deterministic Production Planning: Algorithms and Complexity , 1980 .
[11] Rakesh Nagi,et al. Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies , 1998 .
[12] F. Robert Jacobs,et al. REPETITIVE LOTS: FLOW-TIME REDUCTIONS THROUGH SEQUENCING AND DYNAMIC BATCH SIZING , 1988 .
[13] Kenneth R. Baker,et al. Basic Techniques for Lot Streaming , 1993, Oper. Res..
[14] Dean H. Kropp,et al. Optimal and Heuristic Models for Lot Splitting in a Flow Shop , 1990 .
[15] FlorianM.,et al. Deterministic Production Planning , 1980 .
[16] Hamdy A. Taha,et al. Operations research: an introduction / Hamdy A. Taha , 1982 .