Utilization of real-time models for the survey and maintenance of high power electrotechnical systems

This paper illustrates one particular method whereby a real-time model simultaneously operates with an actual Power Electrotechnical System. The principle consists of using the “instantaneous difference” between significant quantities of the actual system and the same quantities simulated in the model.