Abstract The actual construction time and cost of construction projects may be affected by the client, project and contractual characteristics and in many cases can be very different from the contract time and cost. In this paper, details of 93 Australian construction projects are used to develop several models for actual construction time and cost prediction. A forward crossvalidation regression analysis is used for the development of the model for actual construction time forecast when client sector, contractor selection method, contractual arrangement, project type, contract period and contract sum are known. The standard deviation of the deleted residual indicates the best model for actual construction time prediction to comprise the independent variables log contract time, lump sum procurement and non-standard contractor selection. Regression models are also developed for forecasting the actual construction time and cost when client sector, contractor selection method, contractual arrangement and project type are known while contract period and contract sum are estimated. Different forms of regression analyses, including the standard regression and the crossvalidation regression, are used and the crossvalidation regression model with the smallest deleted residual sum of squares is selected. Since these models for time and cost are dependent on the contract period and contract sum being known, it is necessary to investigate the effects in situations where these have to be estimated. The results of the sensitivity analyses show that the errors in predicted actual construction time become smaller as the contract period increases. In contrast, the errors in predicted actual construction cost are virtually the same for large and small projects. The effects of different project type, contractor selection method and contractual arrangement are also examined. The results indicate that the actual construction time for industrial project is the longest when compared with residential, educational and recreational projects and that significant savings in actual construction time can be achieved when negotiated tender and design and build contract are used instead of the traditional open tendering and lump sum contract approaches. Finally, some practical applications of the models are illustrated for predicting the actual construction time and cost based on the risks and uncertainties of different client sector, contractor selection method, contractual arrangement and project type.
[1]
Derek H.T. Walker,et al.
An investigation into construction time performance
,
1995
.
[2]
A. C. Sidwell,et al.
The Time Performance of Construction Projects
,
1984
.
[3]
Nm Bouchlaghem,et al.
Linear programming for time and cost optimisation
,
1996
.
[4]
Mohan M. Kumaraswamy,et al.
A study of the factors affecting construction durations in Hong Kong
,
1995
.
[5]
Andrew D.F. Price,et al.
Relationship between value and duration for construction projects
,
1991
.
[6]
Vernon Ireland,et al.
The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects
,
1985
.
[7]
Albert P.C. Chan.
Modelling building durations in Hong Kong
,
1999
.
[8]
Louis Edward Alfeld.
Construction Productivity: On-Site Measurement and Management
,
1989
.
[9]
Ka Chi Lam,et al.
The predictive ability of Bromilow's timecost model
,
2001
.