Significant factors influencing the bid mark-up decision of infrastructure projects in Sri Lanka
暂无分享,去创建一个
[1] J. C. Campbell,et al. American Policy and World Settlement , 1948 .
[2] V A Chadwick. The infrastructure of development , 1980 .
[3] Irtishad Ahmad,et al. Questionnaire Survey on Bidding in Construction , 1988 .
[4] Ali A. Shash,et al. Factors affecting a contractor's mark-up size decision in Saudi Arabia , 1992 .
[5] A. Shash. Factors considered in tendering decisions by top UK contractors , 1993 .
[6] Souraya Sidani,et al. Quantitative and qualitative methods:: Is There an Alternative? , 1995 .
[7] Simaan M. AbouRizk,et al. UTILITY-THEORY MODEL FOR BID MARKUP DECISIONS , 1996 .
[8] Aminah Robinson Fayek,et al. A Survey of Tendering Practices in the Australian Construction Industry , 1998 .
[9] Ali A. Shash,et al. SUBCONTRACTORS' BIDDING DECISIONS , 1998 .
[10] Aminah Robinson Fayek,et al. A survey of the bidding practices of Canadian civil engineering construction contractors , 1999 .
[11] Symeon E. Christodoulou,et al. The Science in Human Intuition: Optimum Bid Markup Calculation in Competitive Bidding Environments Using Probabilistic Neural Networks , 2000 .
[12] Mohammed Fadhil Dulaimi,et al. The factors influencing bid mark-up decisions of large- and medium-size contractors in Singapore , 2002 .
[13] Sangwook Lee,et al. Bid-markup determination for microtunneling projects , 2004 .
[14] C. Schell. The Value of the Case Study as a Research Strategy , 2004 .
[15] Bent Flyvbjerg,et al. Policy and Planning for Large-Infrastructure Projects: Problems, Causes, Cures , 2005, 1303.7400.
[16] Florence Yean Yng Ling. GLOBAL FACTORS AFFECTING MARGIN-SIZE OF CONSTRUCTION PROJECTS , 2005 .
[17] Min Liu,et al. Modeling a Contractor’s Markup Estimation , 2005 .
[18] Hsiu-Fang Hsieh,et al. Three Approaches to Qualitative Content Analysis , 2005, Qualitative health research.
[19] Florence Yean Yng Ling,et al. Factors considered by successful and profitable contractors in mark-up size decision in Singapore , 2005 .
[20] Philip E. T. Lewis,et al. Research Methods for Business Students , 2006 .
[21] Abdulrezak N. Mohamed,et al. A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions , 2007 .
[22] Z. Zainal. Case Study As a Research Method , 2007 .
[23] Irem Dikmen,et al. A case-based decision support tool for bid mark-up estimation of international construction projects , 2007 .
[24] B. Flyvbjerg. Policy and Planning for Large-Infrastructure Projects: Problems, Causes, Cures , 2005, 1303.7400.
[25] Samia Khan,et al. Cultivating the Under-Mined: Cross-Case Analysis as Knowledge Mobilization , 2008 .
[26] Hemanta Doloi,et al. Application of AHP in improving construction productivity from a management perspective , 2008 .
[27] D. Thakur. Research Methodology in Social Sciences , 2009 .
[28] Ranjan Kumar Dash,et al. Infrastructure development and economic growth in India , 2009 .
[29] Anup Wilfred,et al. A METHODOLOGY TO IDENTIFY THE DELAYS AND RANK ITS CAUSATIVE FACTORS IN INDIAN CONSTRUCTION INDUSTRY , 2015 .
[30] C. Rambo,et al. Effects of Delayed Payment of Contractors on the Completion of Infrastructural Projects: A Case of Sondu-Miriu Hydropower Project, Kisumu County, Kenya , 2015 .
[31] Baks Perera,et al. A Framework to select the most suitable delay analysis technique for building construction through a consideration of utility factors , 2016 .
[32] M. Brook. Estimating and Tendering for Construction Work , 2016 .
[33] Qiming Li,et al. Construction Project Bidding Research Based on Game Theory and Target Cost Pre-control Management , 2017 .
[34] Nabil Semaan,et al. A deterministic contractor selection decision support system for competitive bidding , 2017 .
[35] Gul Polat,et al. Data Envelopment Analysis (DEA) Approach for Making the Bid/No Bid Decision: A Case Study in a Turkish Construction Contracting Company , 2017 .