Prioritization of maintenance tasks on industrial equipment for reliability

Purpose – This paper aims to prioritize preventive maintenance actions on process equipment by evaluating the risk associated with failure modes using predictive maintenance data instead of maintenance history alone.Design/methodology/approach – In process plants, maintenance task identification is based on the failure mode and effect analysis (FMEA). To eliminate or mitigate risk caused by failure modes, maintenance tasks need to be prioritized. Risk priority number (RPN) can be used to rank the risk. RPN is estimated invariably using maintenance history. However, maintenance history has deficiencies, like limited data, inconsistency etc. To overcome these deficiencies, the proposed approach uses the predictive maintenance data clubbed with expert domain knowledge. Unlike the traditional single step approach, RPN is estimated in two steps, i.e. Step 1 estimates the “Possibility of failure mode detection” and Step 2 estimates RPN using output of step 1. Fuzzy sets and approximate reasoning are used to han...

[1]  D. Dubois,et al.  A set-theoretic view of belief functions: Logical operations and approximations by fuzzy sets , 1986 .

[2]  J. P. Modak,et al.  Maintenance strategy for tilting table of rolling mill based on reliability considerations , 2003, Reliab. Eng. Syst. Saf..

[3]  T. Ross Fuzzy Logic with Engineering Applications , 1994 .

[4]  J. Moubray Reliability-Centered Maintenance , 1991 .

[5]  Dinesh Kumar,et al.  Systematic failure mode effect analysis (FMEA) using fuzzy linguistic modelling , 2005 .

[6]  J. Bowles,et al.  Application of fuzzy logic to reliability engineering , 1995, Proc. IEEE.

[7]  F S Nowlan,et al.  RELIABILITY-CENTERED MAINTENANCE , 1978 .

[8]  Ralph A. Evans Data, data, oh where art thou data? , 2002, IEEE Trans. Reliab..

[9]  R.E. Brown,et al.  Failure rate modeling using equipment inspection data , 2004, IEEE Transactions on Power Systems.

[10]  Lotfi A. Zadeh,et al.  The Concepts of a Linguistic Variable and its Application to Approximate Reasoning , 1975 .

[11]  D.R. Hart Linking equipment reliability & optimum repair practices a business-based maintenance approach , 2005, Conference Record Cement Industry Technical Conference, 2005..

[12]  K. Misra Reliability Analysis and Prediction: A Methodology Oriented Treatment , 1992 .

[13]  Andrew K. S. Jardine,et al.  Optimizing condition based maintenance decisions , 2002, Annual Reliability and Maintainability Symposium. 2002 Proceedings (Cat. No.02CH37318).

[14]  Daming Lin,et al.  A review on machinery diagnostics and prognostics implementing condition-based maintenance , 2006 .

[15]  Robert F. Handschuh,et al.  Transmission Diagnostic Research at NASA Lewis Research Center. , 1995 .

[16]  Robert E. Melchers,et al.  Probabilistic Risk Assessment of Engineering Systems , 1997 .

[17]  Liliane Pintelon,et al.  Case study: RCM – yes, no or maybe? , 1999 .