The Art of Evaluating Monitoring Schemes — How to Measure the Performance of Control Charts?
暂无分享,去创建一个
[1] Sven Knoth,et al. Computation of the ARL for CUSUM-S , 2006, Comput. Stat. Data Anal..
[2] Sven Knoth,et al. Accurate ARL computation for EWMA-S2 control charts , 2005, Stat. Comput..
[3] Alexander Aue,et al. Delay time in sequential detection of change , 2004 .
[4] Douglas M. Hawkins,et al. The Changepoint Model for Statistical Process Control , 2003 .
[5] Marianne Frisén,et al. Statistical Surveillance. Optimality and Methods , 2003 .
[6] Sven Knoth,et al. EWMA Schemes with Nonhomogeneous Transition Kernels , 2003 .
[7] Y. Mei. Asymptotically optimal methods for sequential change-point detection , 2003 .
[8] T. Lai. SEQUENTIAL ANALYSIS: SOME CLASSICAL PROBLEMS AND NEW CHALLENGES , 2001 .
[9] Ronald B. Crosier,et al. Fast Initial Response for CUSUM Quality-Control Schemes: Give Your CUSUM A Head Start.: Give Your CUSUM A Head Start. , 2000 .
[10] S. W. Roberts,et al. Control Chart Tests Based on Geometric Moving Averages , 2000, Technometrics.
[11] Douglas C. Montgomery,et al. Research Issues and Ideas in Statistical Process Control , 1999 .
[12] H. Poor. Quickest detection with exponential penalty for delay , 1998 .
[13] Tze Leung Lai,et al. Information Bounds and Quick Detection of Parameter Changes in Stochastic Systems , 1998, IEEE Trans. Inf. Theory.
[14] Benjamin Yakir,et al. ON THE AVERAGE RUN LENGTH TO FALSE ALARM IN SURVEILLANCE PROBLEMS WHICH POSSESS , 1998 .
[15] M. Morais,et al. Two stochastic properties of one‐sided exponentially weighted moving average control charts∗ , 1998 .
[16] Peter Wessman,et al. Quality Improvements by Likelihood Ratio Methods for Surveillance , 1998 .
[17] Moshe Pollak,et al. Average run length to false alarm for surveillance schemes designed with partially specified pre-change distribution , 1997 .
[18] J. Bert Keats,et al. Economic Modeling for Statistical Process Control , 1997 .
[19] F. Gan. Joint monitoring of process mean and variance using exponentially weighted moving average control charts , 1995 .
[20] T. Lai. Sequential changepoint detection in quality control and dynamical systems , 1995 .
[21] William H. Woodall,et al. Alarm rates for quality control charts , 1995 .
[22] Fah Fatt Gan,et al. A CUMULATIVE SUM CONTROL CHART FOR MONITORING PROCESS VARIANCE , 1995 .
[23] Kenneth E. Case,et al. Economic Design of Control Charts: A Literature Review for 1981–1991 , 1994 .
[24] K. E. Case,et al. THE ECONOMICALLY-BASED EWMA CONTROL CHART , 1994 .
[25] Stephen V. Crowder,et al. An EWMA for Monitoring a Process Standard Deviation , 1992 .
[26] Moshe Pollak,et al. A Small Sample Size Comparison of the Cusum and Shiryayev-Roberts Approaches: Changepoint Detection , 1991 .
[27] Alexander Novikov,et al. On the First Passage Time of an Autoregressive Process over a Level and an Application to a “Disorder” Problem , 1991 .
[28] Y. Ritov. Decision Theoretic Optimality of the Cusum Procedure , 1990 .
[29] James M. Lucas,et al. Exponentially weighted moving average control schemes: Properties and enhancements , 1990 .
[30] G. Moustakides. Optimal stopping times for detecting changes in distributions , 1986 .
[31] J. Stuart Hunter,et al. The exponentially weighted moving average , 1986 .
[32] Ronald B. Crosier,et al. A new two-sided cumulative sum quality control scheme , 1986 .
[33] M. Pollak. Optimal Detection of a Change in Distribution , 1985 .
[34] D. Siegmund,et al. A diffusion process and its applications to detecting a change in the drift of Brownian motion , 1984 .
[35] William H. Woodall,et al. The Distribution of the Run Length of One-Sided CUSUM Procedures for Continuous Random Variables , 1983 .
[36] Alʹbert Nikolaevich Shiri︠a︡ev,et al. Optimal stopping rules , 1977 .
[37] T. Lai. Control Charts Based on Weighted Sums , 1974 .
[38] R. Madsen,et al. Ergodic Behavior for Nonnegative Kernels , 1973 .
[39] Tze Leung Lai,et al. Gaussian Processes, Moving Averages and Quick Detection Problems , 1973 .
[40] A. N. Sirjaev,et al. Statistical Sequential Analysis , 1973 .
[41] D. A. Evans,et al. An approach to the probability distribution of cusum run length , 1972 .
[42] G. Lorden. PROCEDURES FOR REACTING TO A CHANGE IN DISTRIBUTION , 1971 .
[43] S. W. Roberts. A Comparison of Some Control Chart Procedures , 1966 .
[44] A. Shiryaev. On Optimum Methods in Quickest Detection Problems , 1963 .
[45] J. Bather. Control Charts and the Minimization of Costs , 1963 .
[46] K. W. Kemp,et al. Sampling inspection of continuous processes with no autocorrelation between successive results , 1960 .
[47] G. Barnard. Control Charts and Stochastic Processes , 1959 .
[48] E. S. Page. CONTINUOUS INSPECTION SCHEMES , 1954 .
[49] E. S. Page,et al. Control Charts for the Mean of a Normal Population , 1954 .
[50] M. A. Girshick,et al. A BAYES APPROACH TO A QUALITY CONTROL MODEL , 1952 .
[51] H. Levene,et al. The Effectiveness of Quality Control Charts , 1950 .
[52] A. R. Crathorne,et al. Economic Control of Quality of Manufactured Product. , 1933 .