Stackelberg-Nash Equilibrium for Integrated Gravelly Soil Excavation-Transportation-Distribution System in a Large-Scale Hydropower Construction Project

AbstractDuring the last few decades because of the increasing interactions between the supply chain entities, supply chain management research has matured. However, there has been limited research focused on construction supply chain problems. This paper presents an excavation-distribution problem with two-stage transportation for a two-echelon gravelly soil supply chain in a large-scale hydropower construction project. In this problem, Stackelberg game behavior is used to deal with the complex interactions exhibited between the decision entities in a fuzzy random uncertain environment, and bilevel programming is adopted to find the Stackelberg-Nash equilibrium solution. Further, a novel three-level programming Stackelberg model is developed to examine the dynamic game behavior and complex interactions between the entities and to determine the Stackelberg-Nash equilibrium solution for a gravelly soil two-echelon supply chain. To deal with the uncertainties, a hybrid crisp approach and an expected value op...

[1]  P. James,et al.  A review of the progress towards the adoption of supply chain management (SCM) relationships in construction , 2002 .

[2]  Charles E. Blair,et al.  Computational Difficulties of Bilevel Linear Programming , 1990, Oper. Res..

[3]  A. Ciric,et al.  A dual temperature simulated annealing approach for solving bilevel programming problems , 1998 .

[4]  Degao Zou,et al.  Numerical Simulation on Slabs Dislocation of Zipingpu Concrete Faced Rockfill Dam during the Wenchuan Earthquake Based on a Generalized Plasticity Model , 2014, TheScientificWorldJournal.

[5]  Timon C. Du,et al.  Applying collaborative transportation management models in global third-party logistics , 2003, Int. J. Comput. Integr. Manuf..

[6]  Javier Irizarry,et al.  Integrating BIM and GIS to improve the visual monitoring of construction supply chain management , 2013 .

[7]  Xiaolan Xie,et al.  Design of Stochastic Distribution Networks Using Lagrangian Relaxation , 2008, IEEE Transactions on Automation Science and Engineering.

[8]  Jiuping Xu,et al.  Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to a Large Scale Hydropower Construction Project , 2014, TheScientificWorldJournal.

[9]  Baabak Ashuri,et al.  Shuffled Frog-Leaping Model for Solving Time-Cost-Resource Optimization Problems in Construction Project Planning , 2015 .

[10]  J R Saunders,et al.  A particle swarm optimizer with passive congregation. , 2004, Bio Systems.

[11]  Jan Bröchner,et al.  Managing information flow in construction supply chains , 2005 .

[12]  J. Nash NON-COOPERATIVE GAMES , 1951, Classics in Game Theory.

[13]  X. Xue,et al.  Coordination mechanisms for construction supply chain management in the Internet environment , 2007 .

[14]  Russell C. Eberhart,et al.  A discrete binary version of the particle swarm algorithm , 1997, 1997 IEEE International Conference on Systems, Man, and Cybernetics. Computational Cybernetics and Simulation.

[15]  M. Cooper,et al.  CHARACTERISTICS OF SUPPLY CHAIN MANAGEMENT AND THE IMPLICATIONS FOR PURCHASING AND LOGISTICS STRATEGY. , 1993 .

[16]  Seyed Jafar Sadjadi,et al.  A probabilistic bi-level linear multi-objective programming problem to supply chain planning , 2007, Appl. Math. Comput..

[17]  Sankar Sengupta,et al.  A hierarchical process industry production–distribution planning model , 2009 .

[18]  Jiuping Xu,et al.  Production-distribution planning of construction supply chain management under fuzzy randomenvironment for large-scale construction projects , 2012 .

[19]  E. Lee,et al.  Fuzzy and Multi-Level Decision Making: An Interactive Computational Approach , 2001 .

[20]  Tien-Fu Liang,et al.  Fuzzy multi-objective production/distribution planning decisions with multi-product and multi-time period in a supply chain , 2008, Comput. Ind. Eng..

[21]  Xianhai Meng,et al.  Assessment framework for construction supply chain relationships: Development and evaluation , 2010 .

[22]  Ichiro Nishizaki,et al.  Cooperative and Noncooperative Multi-Level Programming , 2009 .

[23]  Guohe Huang,et al.  Dual-Interval Fuzzy Stochastic Programming Method for Long-Term Planning of Municipal Solid Waste Management , 2010, J. Comput. Civ. Eng..

[24]  Ue-Pyng Wen,et al.  The hybrid algorithm for solving the three-level linear programming problem , 1986, Comput. Oper. Res..

[25]  Wansheng Tang,et al.  Minimum risk criterion for uncertain production planning problems , 2011, Comput. Ind. Eng..

[26]  H. Zimmermann Fuzzy programming and linear programming with several objective functions , 1978 .

[27]  H. Stackelberg,et al.  Marktform und Gleichgewicht , 1935 .

[28]  Y. B. Park,et al.  An integrated approach for production and distribution planning in supply chain management , 2005 .

[29]  Poojitha D. Yapa,et al.  Linked lists for transport simulations using Lagrangian parcels , 1996 .

[30]  R. J. Kuo,et al.  Application of particle swarm optimization algorithm for solving bi-level linear programming problem , 2009, Comput. Math. Appl..

[31]  Michel Gendreau,et al.  A hybrid Tabu-ascent algorithm for the linear Bilevel Programming Problem , 1996, J. Glob. Optim..

[32]  Chung-Wei Feng,et al.  Using genetic algorithms to solve construction time-cost trade-off problems , 1997 .

[33]  Huibert Kwakernaak,et al.  Fuzzy random variables - I. definitions and theorems , 1978, Inf. Sci..

[34]  Wenli Li,et al.  Collaborative production planning of supply chain under price and demand uncertainty , 2011, Eur. J. Oper. Res..

[35]  Anupam Ojha,et al.  An entropy based solid transportation problem for general fuzzy costs and time with fuzzy equality , 2009, Math. Comput. Model..

[36]  Jonathan F. Bard,et al.  An explicit solution to the multi-level programming problem , 1982, Comput. Oper. Res..