Modeling and prediction for the thrust on EPB TBMs under different geological conditions by considering mechanical decoupling
暂无分享,去创建一个
[1] Zhende Hou,et al. Mechanical characterization of the load distribution on the cutterhead–ground interface of shield tunneling machines , 2015 .
[2] Wout Broere,et al. Tunnel-boring in soft soil: A study on the driving forces applied to a slurry-shield TBM , 2012 .
[3] Gong Guo-fang Yang Hua-yong Wang Hui Shi Hu. Determination of thrust force for shield tunneling machine , 2011 .
[4] Yilan Kang,et al. Inverse Analysis and Modeling for Tunneling Thrust on Shield Machine , 2013 .
[5] H. Copur,et al. Estimating torque, thrust and other design parameters of different type TBMs with some criticism to TBMs used in Turkish tunneling projects , 2014 .
[6] J. Rostami,et al. Disc cutting tests in Colorado Red Granite: Implications for TBM performance prediction , 2007 .
[7] Guofang Gong,et al. A new calculation model of cutterhead torque and investigation of its influencing factors , 2012 .
[8] Mitsutaka Sugimoto,et al. Theoretical Model of Shield Behavior During Excavation. I: Theory , 2002 .
[9] Lai Xinmin,et al. A stiffness-matching based evaluation approach for compliance of mechanical systems in shield tunneling machines , 2012 .
[10] Kourosh Shahriar,et al. A support vector regression model for predicting tunnel boring machine penetration rates , 2014 .
[11] H. Copur,et al. Predicting performance of EPB TBMs by using a stochastic model implemented into a deterministic model , 2014 .
[12] Pål Drevland Jakobsen,et al. Development of the Soft Ground Abrasion Tester (SGAT) to predict TBM tool wear, torque and thrust , 2013 .
[13] Zhonghua Wu,et al. Mathematical Modeling of Heat and Mass Transfer in Energy Science and Engineering , 2013 .
[14] Qiuming Gong,et al. Study on rock mass boreability by TBM penetration test under different in situ stress conditions , 2014 .
[15] Yilan Kang,et al. The energy method to predict disc cutter wear extent for hard rock TBMs , 2012 .
[16] Jamal Rostami,et al. 3D finite difference model for simulation of double shield TBM tunneling in squeezing grounds , 2014 .
[17] Yilan Kang,et al. Disc cutter wear prediction for a hard rock TBM cutterhead based on energy analysis , 2015 .
[18] M. Monjezi,et al. Study of the influence of geotechnical parameters on the TBM performance in Tehran–Shomal highway project using ANN and SPSS , 2013, Arabian Journal of Geosciences.
[19] Yilan Kang,et al. Analysis of Mechanical Properties of Two Typical Kinds of Cutterheads of Shield Machine , 2011 .
[20] K. Johnson. Contact Mechanics: Frontmatter , 1985 .
[21] Günther Meschke,et al. A 3D finite element simulation model for TBM tunnelling in soft ground , 2004 .
[22] Jing Yang,et al. Multi-directional coupling dynamic characteristics analysis of TBM cutterhead system based on tunnelling field test , 2015 .
[23] Soo-Ho Chang,et al. Evaluation of cutting efficiency during TBM disc cutter excavation within a Korean granitic rock using linear-cutting-machine testing and photogrammetric measurement , 2013 .
[24] Yilan Kang,et al. Theoretical model for loads prediction on shield tunneling machine with consideration of soil-rock interbedded ground , 2013 .
[25] Xu Zhang,et al. Dynamic Characteristics Study with Multidegree-of-Freedom Coupling in TBM Cutterhead System Based on Complex Factors , 2013 .
[26] Jamal Rostami,et al. Study of pressure distribution within the crushed zone in the contact area between rock and disc cutters , 2013 .