Links to the Future: Communication Requirements and Challenges in the Smart Grid
暂无分享,去创建一个
F. Bouhafs | M. Merabti | M. Mackay | M. Merabti | F. Bouhafs | M. Mackay | F. Bouhafs
[1] S.D.J. McArthur,et al. Exploiting Multi-agent System Technology within an Autonomous Regional Active Network Management System , 2007, 2007 International Conference on Intelligent Systems Applications to Power Systems.
[2] C. S. Edrington,et al. A review of PHEV grid impacts , 2009, 41st North American Power Symposium.
[3] H.S. Matthews,et al. Scoping the potential of monitoring and control technologies to reduce energy use in homes , 2007, Proceedings of the 2007 IEEE International Symposium on Electronics and the Environment.
[4] D.G. Hart,et al. Using AMI to realize the Smart Grid , 2008, 2008 IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century.
[5] Graham Ault,et al. Active power flow management to facilitate increased connection of renewable and distributed generation to rural distribution networks , 2007 .
[6] A. Bose,et al. A failure to communicate: next generation communication requirements, technologies, and architecture for the electric power grid , 2005, IEEE Power and Energy Magazine.