A Sequencing Problem with Release Dates and Clustered Jobs
暂无分享,去创建一个
[1] H. Weiss. A Greedy Heuristic for Single Machine Sequencing with Precedence Constraints , 1981 .
[2] Jan Karel Lenstra,et al. Complexity of machine scheduling problems , 1975 .
[3] T. Morton,et al. Algoristics for Single-Machine Sequencing with Precedence Constraints , 1978 .
[4] Hiroaki Ishii,et al. ALGORITHM FOR ONE MACHINE JOB SEQUENCING WITH PRECEDENCE CONSTRAINTS , 1981 .
[5] E. Lawler. Sequencing Jobs to Minimize Total Weighted Completion Time Subject to Precedence Constraints , 1978 .
[6] Jitender S. Deogun. On Scheduling with Ready Times to Minimize Mean Flow Time , 1983, Comput. J..
[7] W. A. Horn. Single-Machine Job Sequencing with Treelike Precedence Ordering and Linear Delay Penalties , 1972 .
[8] D. Adolphson. Optimal linear-ordering. , 1973 .
[9] Chris N. Potts,et al. An algorithm for single machine sequencing with release dates to minimize total weighted completion time , 1983, Discret. Appl. Math..
[10] Linus Schrage,et al. Dynamic Programming Solution of Sequencing Problems with Precedence Constraints , 1978, Oper. Res..
[11] Wayne E. Smith. Various optimizers for single‐stage production , 1956 .
[12] Donald L. Adolphson,et al. Single Machine Job Sequencing with Precedence Constraints , 1977, SIAM J. Comput..
[13] Jeffrey B. Sidney,et al. Decomposition Algorithms for Single-Machine Sequencing with Precedence Relations and Deferral Costs , 1975, Oper. Res..
[14] Jitender S. Deogun,et al. Sequencing Jobs with Unequal Ready Times to Minimize Mean Flow Time , 1981, SIAM J. Comput..
[15] T. B. Tate,et al. Machine Scheduling Problems , 1978 .