The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty
暂无分享,去创建一个
[1] Daniel Sipper,et al. Production: Planning, Control and Integration , 1997 .
[2] Everett E. Adam,et al. Forecasting error evaluation in material requirements planning (MRP) production-inventory systems , 1986 .
[3] W. C. Benton,et al. Vendor Performance and Alternative Manufacturing Environments , 1990 .
[4] Genaro J. Gutierrez,et al. Effect of increasing component commonality on service level and holding cost , 1992 .
[5] David D. Yao,et al. Performance Analysis and Optimization of Assemble-to-Order Systems with Random Lead Times , 2002, Oper. Res..
[6] Feng Cheng,et al. Inventory-Service Optimization in Configure-to-Order Systems , 2002, Manuf. Serv. Oper. Manag..
[7] K. R. Baker,et al. The Effect of Commonality on Safety Stock in a Simple Inventory Model , 1986 .
[8] Wallace J. Hopp,et al. Setting safety leadtimes for purchased components in assembly systems , 1993 .
[9] Wei Wang,et al. Commonality and postponement in multistage assembly systems , 2002, Eur. J. Oper. Res..
[10] B. W. Taylor,et al. A simulation-based experimental investigation of supply/timing uncertainty in MRP systems , 1984 .
[11] Wallace J. Hopp,et al. Setting procurement safety lead-times for assembly systems , 2001 .
[12] Surendra M. Gupta,et al. MRP systems under supply and process uncertainty in an integrated shop floor control , 1995 .
[13] Mark Treleven,et al. Component part standardization: An analysis of commonality sources and indices , 1986 .
[14] M. J. Rosenblatt,et al. Component commonality effects on inventory costs , 1996 .
[15] Chwen Sheu,et al. The effects of purchased parts commonality on manufacturing lead time , 1997 .
[16] W. C. Benton,et al. PRODUCT STRUCTURE COMPLEXITY AND MULTILEVEL LOT SIZING USING ALTERNATIVE COSTING POLICIES , 1985 .
[17] D. Collier. Aggregate Safety Stock Levels and Component Part Commonality , 1982 .
[18] Surendra M. Gupta,et al. A structured analysis of material requirements planning systems under combined demand and supply uncertainty , 1993 .
[19] Candace Aral Yano,et al. Stochastic Leadtimes in Two-Level Assembly Systems , 1987 .
[20] Morris A. Cohen,et al. Optimal material control in an assembly system with component commonality , 2001 .
[21] M. Magazine,et al. Component Commonality with Service Level Requirements , 1988 .