Recent problems with road contracts

At a time when there is an increasing amount of roadwork construction being performed by private contractors it is considered appropriate to consider some recent developments in preparation of contract documents and the administration of contracts. Naturally most developments are the result of contractual problems and claims and in these times it is not uncommon for a contractor to employ the services of claims consultants and geotechnical or other specialist consultants for the preparation of claims in the value of $300,000 approximately, or in excess thereof. Accordingly there is a need for the principal to prepare accurate and detailed contract documents and to provide adequate competent supervision complete with detailed records to ensure a satisfactory administration of contract free from extravagant claims being lodged by the contractor and subsequent long drawn out disputes with the contractor.