Freezing the master production schedule under single resource constraint and demand uncertainty

Abstract This paper investigates the impact of freezing the master production schedule (MPS) in multi-item single-level systems with a single resource constraint under demand uncertainty. It also examines the impact of environmental factors on the selection of MPS freezing parameters. A computer model is built to simulate master production scheduling activities in a multi-item system under a rolling time horizon. The result of the study shows that the parameters for freezing the MPS have a significant impact on total cost, schedule instability and the service level of the system. Furthermore, the selection of freezing parameters is also significantly influenced by some environmental factors such as capacity tightness and cost structure. While some findings concerning the performance of MPS freezing parameters without capacity constraints can be generalised to the case of limited capacity, other conclusions under capacity constraints are different from those without capacity constraints.

[1]  V. Sridharan,et al.  Freezing the Master Production Schedule Under Demand Uncertainty , 1990 .

[2]  V. Sridharan,et al.  Freezing the Master Production Schedule: Implications for Fill Rate* , 1994 .

[3]  T. C. Ireland,et al.  Correlating MRP system nervousness with forecast errors , 1998 .

[4]  E. Silver,et al.  A heuristic solution procedure for the multi-item, single-level, limited capacity, lot-sizing problem , 1981 .

[5]  Xiande Zhao,et al.  Freezing the master production schedule in multilevel material requirements planning systems under deterministic demand , 1996 .

[6]  Everett E. Adam,et al.  Forecasting error evaluation in material requirements planning (MRP) production-inventory systems , 1986 .

[7]  Chrwan-Jyh Ho,et al.  An investigation of alternative dampening procedures to cope with MRP system nervousness , 1996 .

[8]  Xiande Zhao,et al.  Lot-sizing rules and freezing the master production schedule in material requirements planning systems under demand uncertainty , 1995 .

[9]  Joseph D. Blackburn,et al.  HEURISTIC LOT‐SIZING PERFORMANCE IN A ROLLING‐SCHEDULE ENVIRONMENT* , 1980 .

[10]  Xiande Zhao,et al.  Lot-sizing rules and freezing the master production schedule in material requirements planning systems , 1997 .

[11]  Dean H. Kropp,et al.  Alternative approaches to schedule instability: a comparative analysis , 1987 .

[12]  Dean H. Kropp,et al.  THE EFFECTIVENESS OF EXTENDING THE HORIZON IN ROLLING PRODUCTION SCHEDULING , 1982 .

[13]  V. Sridharan,et al.  Freezing the Master Production Schedule Under Rolling Planning Horizons , 1987 .

[14]  Neng-Pai Lin,et al.  A Model for Master Production Scheduling in Uncertain Environments , 1992 .

[15]  Luk N. Van Wassenhove,et al.  Multi-Item Single-Level Capacitated Dynamic Lot-Sizing Heuristics: A General Review , 1988 .

[16]  Dean H. Kropp,et al.  A comparison of strategies to dampen nervousness in MRP systems , 1986 .

[17]  William L. Berry,et al.  MEASURING MASTER PRODUCTION SCHEDULE STABILITY UNDER ROLLING PLANNING HORIZONS , 1988 .

[18]  Lin Ma,et al.  Parameters affecting the effectiveness of MRP systems , 1998 .

[19]  Sukran N. Kadipasaoglu,et al.  Measurement of instability in multi-level MRP systems , 1997 .

[20]  Jinxing Xie,et al.  Multilevel lot-sizing heuristics and freezing the master production schedule in material requirements planning systems , 1998 .

[21]  V. Sridharan,et al.  Master production scheduling make-to-stock products: a framework for analysis , 1990 .

[22]  S. Selcuk Erenguc,et al.  Multiple‐stage production planning research: history and opportunities , 1996 .

[23]  Marc Salomon,et al.  Batching decisions: structure and models , 1994 .

[24]  Xiande Zhao,et al.  Freezing the master production schedule for material requirements planning systems under demand uncertainty , 1993 .

[25]  Jeff Hoi Yan Yeung,et al.  Parameters affecting the effectiveness of MRP systems: A review , 1998 .

[26]  Hans-Otto Günther,et al.  Numerical evaluation of heuristics for the multi-item single-level capacitated lot-size problem , 1988 .

[27]  William L. Berry,et al.  Manufacturing Planning and Control Systems , 1984 .

[28]  V. Sridharan,et al.  Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty , 1995 .

[29]  Reza Eftekharzadeh A Comprehensive Review of Production Lot‐sizing , 1993 .