Evaluation of traditional work scheduling rules in a flexible manufacturing system with a physical simulator
暂无分享,去创建一个
[1] David Burden,et al. Production-Inventory Systems: Planning and Control , 1979 .
[2] Roger L. Sisson,et al. Methods of Sequencing in Job Shops---A Review , 1959 .
[3] Eric M. Malstrom,et al. Physical simulation of work scheduling rules in a flexable manufacturing system , 1986 .
[4] Jr. Mikell P. Groover. Automation, production systems, and computer-aided manufacturing , 1980 .
[5] Hoo-Gon Choi. An analysis of traditional work scheduling rules for a flexible manufacturing system , 1985 .
[6] C. T. Baker,et al. Simulation of a Simplified Job Shop , 1960 .