Ant colony algorithms for a two-agent scheduling with sum-of processing times-based learning and deteriorating considerations
暂无分享,去创建一个
Chin-Chia Wu | Yunqiang Yin | Wen-Hsiang Wu | Shuenn-Ren Cheng | Yunqiang Yin | Shuenn-Ren Cheng | Chin-Chia Wu | Wen-Hsiang Wu
[1] Wen-Chiung Lee,et al. A single-machine scheduling problem with two-agent and deteriorating jobs , 2010 .
[2] Ghaith Rabadi,et al. A two-stage Ant Colony Optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times , 2010, J. Intell. Manuf..
[3] Lionel Amodeo,et al. A new approach for workshop design , 2011, J. Intell. Manuf..
[4] Ji-Bo Wang,et al. Comments on “Deteriorating jobs and learning effects on a single-machine scheduling with past-sequence-dependent setup times” , 2011 .
[5] Lixin Tang,et al. Two-agent group scheduling with deteriorating jobs on a single machine , 2010 .
[6] Alessandro Agnetis,et al. Multi-agent single machine scheduling , 2007, Ann. Oper. Res..
[7] T.C.E. Cheng,et al. Scheduling problems with deteriorating jobs and learning effects including proportional setup times , 2010, Comput. Ind. Eng..
[8] Weiping Shang,et al. A note on the scheduling with two families of jobs , 2005, J. Sched..
[9] Ertan Güner,et al. Minimizing the earliness/tardiness costs on parallel machine with learning effects and deteriorating jobs: a mixed nonlinear integer programming approach , 2008 .
[10] T. C. Edwin Cheng,et al. Multi-agent scheduling on a single machine with max-form criteria , 2008, Eur. J. Oper. Res..
[11] F. D. Croce,et al. The two-machine total completion time flow shop problem , 1996 .
[12] Chris N. Potts,et al. Single machine scheduling models with deterioration and learning: handling precedence constraints via priority generation , 2008, J. Sched..
[13] Wen-Chiung Lee,et al. A two-machine flowshop problem with two agents , 2011, Comput. Oper. Res..
[14] Dirk Biskup,et al. A state-of-the-art review on scheduling with learning effects , 2008, Eur. J. Oper. Res..
[15] Peng Liu,et al. A note on two-agent single-machine scheduling problem with deteriorating jobs , 2010, 2010 Chinese Control and Decision Conference.
[16] Lixin Tang,et al. Two-Agent Scheduling with Linear Deteriorating Jobs on a Single Machine , 2008, COCOON.
[17] T. C. Edwin Cheng,et al. Scheduling Problems with the Effects of deterioration and Learning , 2007, Asia Pac. J. Oper. Res..
[18] Alessandro Agnetis,et al. Scheduling Problems with Two Competing Agents , 2004, Oper. Res..
[19] T. C. Edwin Cheng,et al. A two-agent single-machine scheduling problem with truncated sum-of-processing-times-based learning considerations , 2011, Comput. Ind. Eng..
[20] J.-B. Wang. Single machine scheduling with a time-dependent learning effect and deteriorating jobs , 2009, J. Oper. Res. Soc..
[21] Marco Dorigo,et al. Ant system for Job-shop Scheduling , 1994 .
[22] T. C. Edwin Cheng,et al. Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs , 2006, Theor. Comput. Sci..
[23] Ertan Güner,et al. Parallel machine scheduling problem to minimize the earliness/tardiness costs with learning effect and deteriorating jobs , 2010, J. Intell. Manuf..
[24] Jairo R. Montoya-Torres,et al. Ant colony optimization algorithm for a Bi-criteria 2-stage hybrid flowshop scheduling problem , 2011, J. Intell. Manuf..
[25] Bahram Alidaee,et al. Scheduling with time dependent processing times: Review and extensions , 1999, J. Oper. Res. Soc..
[26] Marco Dorigo,et al. Distributed Optimization by Ant Colonies , 1992 .
[27] Luca Maria Gambardella,et al. Ant Algorithms for Discrete Optimization , 1999, Artificial Life.
[28] Bertrand M. T. Lin,et al. A concise survey of scheduling with time-dependent processing times , 2004, Eur. J. Oper. Res..
[29] Sun Shi-jie,et al. The single-machine scheduling problems with deteriorating jobs and learning effect , 2006 .
[30] Zhonghua Ni,et al. Application of ant colony optimization algorithm in process planning optimization , 2013, J. Intell. Manuf..
[31] Li Sun,et al. Single-machine scheduling problems with deteriorating jobs and learning effects , 2009, Comput. Ind. Eng..
[32] Ji-Bo Wang,et al. Single-machine scheduling problems with the effects of learning and deterioration , 2007 .
[33] Lei Wang,et al. Pheromone-based coordination for manufacturing system control , 2012, J. Intell. Manuf..
[34] P. Liu,et al. Two-agent single-machine scheduling problems under increasing linear deterioration , 2011 .
[35] T. C. Edwin Cheng,et al. A note on the complexity of the problem of two-agent scheduling on a single machine , 2006, J. Comb. Optim..
[36] Luca Maria Gambardella,et al. Ant colony system: a cooperative learning approach to the traveling salesman problem , 1997, IEEE Trans. Evol. Comput..
[37] T. C. Edwin Cheng,et al. Some scheduling problems with deteriorating jobs and learning effects , 2008, Comput. Ind. Eng..
[38] Marshall L. Fisher,et al. A dual algorithm for the one-machine scheduling problem , 1976, Math. Program..
[39] Wojciech Bozejko,et al. Parallel path relinking method for the single machine total weighted tardiness problem with sequence-dependent setups , 2010, J. Intell. Manuf..
[40] J.-B. Wang,et al. A note on scheduling problems with learning effect and deteriorating jobs , 2006, Int. J. Syst. Sci..
[41] Jonathan Cole Smith,et al. A Multiple-Criterion Model for Machine Scheduling , 2003, J. Sched..