Sensing Roof Conditions ahead of a Longwall Mining using the Shearer as a Seismic Source
暂无分享,去创建一个
[1] A. Tarantola. Inverse problem theory : methods for data fitting and model parameter estimation , 1987 .
[2] H. Rüter,et al. Seismic Coal Exploration Part B: In-Seam Seismics , 1994 .
[3] Erik Westman,et al. Seismic tomography for longwall stress analysis , 1996 .
[4] G. Kneib,et al. Automatic seismic prediction ahead of the tunnel boring machine , 2000 .
[5] Hal Gurgenci,et al. Longwall automation - An ACARP landmark project , 2002 .
[6] Lawrence M. Gochioco,et al. High-resolution 3-D seismic survey over a coal mine reserve area in the U.S.—A case study , 2000 .
[7] L. Petronio,et al. Seismic interferometry with a TBM source of transmitted and reflected waves , 2006 .
[8] Erik Westman,et al. A Correlation Between Seismic Tomography, Seismic Events And Support Pressure , 1900 .
[9] J. P. Dunford,et al. Development Of Stress Measurements And Instrument Placement Techniques For Longwall Coal , 2001 .