Cost- benefit Analysis of installation of tapping station on bipole VSC-HVDC transmission system
暂无分享,去创建一个
[1] R. Adapa,et al. A value-based reliability enhancement scheme for bulk transmission system planning , 1998 .
[2] Wei Zhang. Reliability evaluation of bulk power systems using analytical and equivalent approaches , 1999 .
[3] Roy Billinton,et al. Requirements for composite system reliability evaluation models , 1988 .
[4] P.R.S. Kuruganty,et al. A reliability cost-benefit analysis for HVDC transmission expansion planning , 1988 .
[5] R. Leelaruji,et al. Availability Assessment of the HVDC Converter Transformer System , 2008, Proceedings of the 10th International Conference on Probablistic Methods Applied to Power Systems.