Simplified resubmitted lot inspection from defect counts
暂无分享,去创建一个
[1] Ayman Baklizi,et al. Acceptance Sampling Based on Truncated Life Tests in the Birnbaum Saunders Model , 2004, Risk analysis : an official publication of the Society for Risk Analysis.
[2] Hamidreza Eskandari,et al. A modified (S − 1, S) inventory system for deteriorating items with Poisson demand and non-zero lead time , 2014 .
[3] Majid Khedmati,et al. Estimating the change point of the parameter vector of multivariate Poisson processes monitored by a multi-attribute T2 control chart , 2013 .
[4] Fu-Kwun Wang,et al. Variables Sampling Plan for Resubmitted Lots in a Process with Linear Profiles , 2016, Qual. Reliab. Eng. Int..
[5] Yasuhiko Takemoto,et al. Reliability tests for Weibull distribution with variational shape parameter based on sudden death lifetime data , 2008, Eur. J. Oper. Res..
[6] Toshio Nakagawa,et al. Optimization Problems of a Parallel System With a Random Number of Units , 2012, IEEE Transactions on Reliability.
[7] Arturo J. Fernández. Bounding maximum likelihood estimates based on incomplete ordered data , 2006, Comput. Stat. Data Anal..
[8] Arturo J. Fernández. Reliability inference and sample-size determination under double censoring for some two-parameter models , 2008, Comput. Stat. Data Anal..
[9] Arturo J. Fernández,et al. Generalized beta prior models on fraction defective in reliability test planning , 2012, J. Comput. Appl. Math..
[10] Thong Ngee Goh,et al. Economic design of exponential charts for time between events monitoring , 2005 .
[11] Muhammad Azam,et al. Variable sampling inspection for resubmitted lots based on process capability index Cpk for normally distributed items , 2013 .
[12] Ching-Ho Yen,et al. Multiple dependent state variable sampling plans with process loss consideration , 2014 .
[13] Arturo J. Fernández,et al. Optimal acceptance sampling plans for log-location-scale lifetime models using average risks , 2012, Comput. Stat. Data Anal..
[14] Arturo J. Fernández,et al. Optimal Defects-Per-Unit Acceptance Sampling Plans Using Truncated Prior Distributions , 2014, IEEE Transactions on Reliability.
[15] Chi-Hyuck Jun,et al. Multiple dependent state sampling plans for lot acceptance based on measurement data , 2007, Eur. J. Oper. Res..
[16] Ching-Ho Yen,et al. A lot inspection sampling plan based on EWMA yield index , 2014 .
[17] Chi-Hyuck Jun,et al. Optimal designing of an SkSP-V skip-lot sampling plan with double-sampling plan as the reference plan , 2012 .
[18] Chien-Wei Wu,et al. Variables sampling inspection scheme for resubmitted lots based on the process capability index Cpk , 2012, Eur. J. Oper. Res..
[19] N. Anbazhagan,et al. Base stock policy with retrial demands , 2013 .
[20] E. B. Wilson,et al. The Distribution of Chi-Square. , 1931, Proceedings of the National Academy of Sciences of the United States of America.
[21] Fah Fatt Gan,et al. Designs of One- and Two-Sided Exponential EWMA Charts , 1998 .
[22] Shi-Woei Lin,et al. A resubmitted sampling scheme by variables inspection for controlling lot fraction nonconforming , 2014 .
[23] Arturo J. Fernández. Optimum attributes component test plans for k-out-of-n: F Weibull systems using prior information , 2015, Eur. J. Oper. Res..
[24] Rainer Göb,et al. Sampling for Nonconformities and Other Issues in the Forthcoming Revision of ISO 2859‐2 , 2012, Qual. Reliab. Eng. Int..
[25] Chien-Wei Wu,et al. A flexible process-capability-qualified resubmission-allowed acceptance sampling scheme , 2015, Comput. Ind. Eng..
[26] Arturo J. Fernández,et al. Optimal Reliability Demonstration Test Plans for $k$-out-of-$n$ Systems of Gamma Distributed Components , 2011, IEEE Transactions on Reliability.
[27] Rasoul Haji,et al. A queueing system with inventory and mixed exponentially distributed lead times , 2011 .
[28] Kondaswamy Govindaraju,et al. Sampling inspection for resubmitted lots , 1997 .
[29] S. T. A. Niaki,et al. A new link function in GLM-based control charts to improve monitoring of two-stage processes with Poisson response , 2014 .
[30] Seyed Taghi Akhavan Niaki,et al. A maximum likelihood approach to estimate the change point of multistage Poisson count processes , 2015 .
[31] Arturo J. Fernández. One- and two-sample prediction based on doubly censored exponential data and prior information , 2004 .
[32] Thong Ngee Goh,et al. Design and application of exponential chart for monitoring time-between-events data under random process shift , 2011 .
[33] Yeong-Dae Kim,et al. Inventory replenishment and delivery planning in a two-level supply chain with compound Poisson demands , 2010 .
[34] Tzong-Ru Tsai,et al. Interval censored sampling plans for the gamma lifetime model , 2009, Eur. J. Oper. Res..
[35] Arturo J. Fernndez. Optimal schemes for resubmitted lot acceptance using previous defect count data , 2015 .