An expert system to manage dispute resolutions in construction projects in Egypt
暂无分享,去创建一个
A. A. Elziny | M. A. Mohamadien | H. M. Ibrahim | M. K. Abdel Fattah | H. M. Ibrahim | M. Mohamadien | M. Fattah
[1] O CheungS,et al. A CBR based dispute resolution process selection system , 2004 .
[2] A. M. Odeh,et al. Causes of construction delay: traditional contracts , 2002 .
[3] Issaka Ndekugri,et al. Disputing the existence of a dispute as a strategy for avoiding construction adjudication , 2006 .
[4] A. Samer Ezeldin,et al. Arbitral Tribunal Proceedings Case Study: Egyptian Large-Scale Construction Project , 2009 .
[5] R. M. Thompson. EFFORTS TO MANAGE DISPUTES IN THE CONSTRUCTION INDUSTRY: A COMPARISON OF THE NEW ENGINEERING CONTRACT AND THE DISPUTE REVIEW BOARD , 1998 .
[6] Ben Coppin,et al. Artificial Intelligence Illuminated , 2004 .
[7] Keith R. Molenaar,et al. Prediction of Construction Disputes in Change Issues , 2000 .
[8] S. Cheung,et al. A study of construction mediator tactics—Part I: Taxonomies of dispute sources, mediator tactics and mediation outcomes , 2007 .
[9] Robert Frank Cushman,et al. Alternative dispute resolution in the construction industry , 1991 .
[10] A. Samer Ezeldin,et al. Dispute Review Boards: Expected Application on Egyptian Large-Scale Construction Projects , 2007 .
[11] James E. Diekmann,et al. Are contract disputes predictable , 1995 .
[12] Richard B. Bilder. An Overview of International Dispute Settlement , 1986 .
[13] Kwok-wing Chau,et al. Application of a PSO-based neural network in analysis of outcomes of construction claims , 2007 .