Analysis Methods in Time-Based Claims
暂无分享,去创建一个
[1] Kirk D. Gothand. Schedule delay analysis: Modified windows approach , 2003 .
[2] M. Asem Abdul-Malak,et al. Process Model for Administrating Construction Claims , 2002 .
[3] Andrew Baldwin,et al. A methodology for assessing construction project delays , 1998 .
[4] Sabah Alkass,et al. Construction delay analysis techniques , 1996 .
[5] David Arditi,et al. Selecting a delay analysis method in resolving construction claims , 2006 .
[6] Michael R. Finke. WINDOW ANALYSES OF COMPENSABLE DELAYS , 1999 .
[7] Michael T. Callahan,et al. Construction Delay Claims , 1992 .
[8] David Arditi,et al. Construction Delay Computation Method , 2001 .
[9] Vera A. Lovejoy. Claims schedule development and analysis: Collapsed as-built scheduling for beginners , 2004 .
[10] R. A. Harris,et al. UK practice in dealing with claims for delay , 2001 .
[11] Means,et al. Building construction cost data , 1943 .
[12] A McInnis. Programming: the Society of Construction Law Delay and Disruption Protocol (SCL) and the Joint Contracts Committee (JCC) , 2003 .
[13] Jon M. Wickwire,et al. Construction Scheduling: Preparation, Liability, and Claims , 1991 .
[14] Abdulaziz A. Bubshait,et al. Comparison of delay analysis methodologies , 1998 .
[15] Saied Kartam. Generic Methodology for Analyzing Delay Claims , 1999 .