Special Features of the Air & Gas Flues of Yangzhou No.2 Power Plant's 600MW Boiler Set and the Observed Problems During Commissioning

The paper describes the boiler's air and gas system of Yangzhou No.2 Power Plant's 600MW set, together with the equipment used, as well the operating experiences. Problems that appeared during commissioning are analyzed. Figs 2 and tables 5