A Decision Support System for Assessing and Controlling the Effectiveness of Multi-Echelon Logistics Actions

We designed a decision support system (DSS) to help logistics managers assess wartime readiness and to identify resource and policy changes that could improve it. The DSS, known as the weapon system management information system (WSMIS), detects situations where theater wartime sortie capability might be jeopardized and by what resource shortages or logistics processing bottlenecks. The WSMIS is designed to distinguish between planned and actual logistics support capabilities. Typically logistics resources are acquired and functional processing capabilities are developed far in advance of their actual application. As a result, many intervening factors can invalidate those support plans. WSMIS provides users with the capability to revalidate or revise those plans when needed.

[1]  C. Lawrence Meador,et al.  Setting Priorities for DSS Development , 1984, MIS Q..

[2]  William R. King,et al.  Alternative Designs in Informatoin System Development , 1982, MIS Q..

[3]  Michael D Rich,et al.  An Integrated View on Improving Combat Readiness. , 1982 .

[4]  R J Hillestad,et al.  Dyna-METRIC: Dynamic Multi-Echelon Technique for Recoverable Item Control. , 1982 .

[5]  Ralph H. Sprague,et al.  Building Effective Decision Support Systems , 1982 .

[6]  Raymond A Pyles The Dyna-Metric Readiness Assessment Model: Motivation, Capabilities, and Use , 1985 .

[7]  Robert S. Tripp,et al.  Blueprints: Adopting a construction trade approach in designing large scale management information systems , 1987, Inf. Manag..

[8]  Richard Hillestad,et al.  Models and Techniques for Recoverable Item Stockage when Demand and the Repair Process are Nonstationary. Part I. Performance Measurement. , 1980 .

[9]  Peter G. W. Keen,et al.  Organizational strategies for personal computing in decision support systems , 1981 .

[10]  Robert S. Tripp,et al.  Using Resource Constraints to Control the Incremental Development of Large Scale MIS Projects , 1989 .

[11]  Niv Ahituv,et al.  A Flexible Approach to Information Systems Developmoent , 1984, MIS Q..

[12]  Hugh F. Juergens Attributes of Information System Development , 1977, MIS Q..

[13]  Daniel S Appleton,et al.  Very large projects , 1986 .

[14]  Carolyn Wong A Successful Software Development , 1984, IEEE Transactions on Software Engineering.

[15]  Terry C. Snow Use of Software Engineering Practices at a Small MIS Shop , 1984, IEEE Transactions on Software Engineering.

[16]  James F. Cox,et al.  A Dynamic Systems Development Life-Cycle Approach: A Project Management Information System , 1985, J. Manag. Inf. Syst..

[17]  Robert S. Tripp,et al.  Measuring and Managing Readiness: The Concept and Design of the Combat Support Capability Management System. , 1982 .