Supply-Chain Management for Recoverable Manufacturing Systems

Recoverable manufacturing systems minimize the environmental impact of industry by reusing materials, reducing energy use, and reducing the need to landfill industrial products. These systems are widespread in the United States and are profitable, in addition to contributing to sustainable development. However, the management of supply-chain activities can differ greatly from management activities in traditional manufacturing supply chains. Seven complicating characteristics increase uncertainty. Managers must take actions to reduce uncertainty in the timing and quantity of returns, balance return rates with demand rates, and make material recovery more predictable. Managers must also plan for the collection of products from end-users. The use of information systems with new production-planning and control techniques makes management of these activities more predictable.

[1]  Christian N. Madu,et al.  Environmental quality planning: A strategic total quality management (STQM) approach , 1995 .

[2]  R. Guide,et al.  Rough-cut capacity planning for remanufacturing firms , 1997 .

[3]  Leo Kroon,et al.  Returnable containers: an example of reverse logistics , 1995 .

[4]  John A. Muckstadt,et al.  An analysis of single item inventory systems with returns , 1981 .

[5]  Erwin van der Laan,et al.  Quantitative models for reverse logistics: A review , 1997 .

[6]  Robert A. Frosch,et al.  Industrial Ecology: Minimizing the Impact of Industrial Waste , 1994 .

[7]  Peter Schuur,et al.  Physical Design of a Reverse Logistic Network: A Multi-Echelon Model , 1996 .

[8]  R. Uzsoy,et al.  Production planning for companies with remanufacturing capability , 1995, Proceedings of the 1995 IEEE International Symposium on Electronics and the Environment ISEE (Cat. No.95CH35718).

[9]  Marc Salomon,et al.  Strategic Issues in Product Recovery Management , 1995 .

[10]  J. Elkington Towards the Sustainable Corporation: Win-Win-Win Business Strategies for Sustainable Development , 1994 .

[11]  Rommert Dekker,et al.  Production planning and inventory control for remanufacturable durable products , 1996 .

[12]  S.D.P. Flapper,et al.  One-way or reusable distribution items? , 1995 .

[13]  E. A. van deLaan,et al.  Production planning and inventory control with remanufacturing and disposal , 1997 .

[14]  Michael R. Johnson,et al.  Planning product disassembly for material recovery opportunities , 1995 .

[15]  Surendra M. Gupta,et al.  Disassembly of complex product structures with parts and materials commonality , 1997 .

[16]  Peter Schuur,et al.  On a medium term product recovery and disposal strategy for durable assembly products , 1998 .

[17]  K. Richter The extended EOQ repair and waste disposal model , 1996 .

[18]  K. Richter Pure and mixed strategies for the EOQ repair and waste disposal problem , 1997 .

[19]  K. Richter The EOQ repair and waste disposal model with variable setup numbers , 1996 .

[20]  Harold Krikke,et al.  Recovery strategies and reverse logistic network design , 2001 .

[21]  R. Srivastava,et al.  Recoverable manufacturing systems: a framework for analysis , 1997, Innovation in Technology Management. The Key to Global Leadership. PICMET '97.

[22]  E. A. van deLaan,et al.  An (s,Q) inventory model with remanufacturing and disposal , 1996 .

[23]  Geraldo Ferrer,et al.  The economics of personal computer remanufacturing , 1997 .

[24]  Janine C. Sekutowski,et al.  Environmentally conscious manufacturing: A technology for the nineties , 1991, AT&T Technical Journal.

[25]  M. Starik,et al.  Weaving An Integrated Web: Multilevel and Multisystem Perspectives of Ecologically Sustainable Organizations , 1995 .

[26]  V D R Guide,et al.  A closed-loop logistics model for remanufacturing , 1999, J. Oper. Res. Soc..

[27]  Tim Cooper The re-use of consumer durables in the UK: obstacles and opportunities , 1996 .

[28]  E. Silver,et al.  Forecasting the returns of reusable containers , 1989 .

[29]  V. Daniel R. Guide,et al.  An evaluation of order release strategies in a remanufacturing environment , 1997, Comput. Oper. Res..

[30]  Alfred J.D. Lambert Optimal disassembly of complex products , 1994 .

[31]  B Piasecki Industrial ecology: an emerging management science. , 1992, Proceedings of the National Academy of Sciences of the United States of America.

[32]  T. Spengler,et al.  Environmental integrated production and recycling management , 1997 .

[33]  T E Graedel,et al.  Industrial ecology: concepts and approaches. , 1992, Proceedings of the National Academy of Sciences of the United States of America.

[34]  Joseph Sarkis,et al.  The role of supply chain management within the industrial ecosystem , 1995, Proceedings of the 1995 IEEE International Symposium on Electronics and the Environment ISEE (Cat. No.95CH35718).

[35]  Rajesh Srivastava,et al.  Inventory buffers in recoverable manufacturing , 1998 .

[36]  Leigh Sparks,et al.  The New German Packaging Laws , 1994 .

[37]  Ad J. de Ron,et al.  Disassembly and recycling of electronic consumer products: an overview , 1995 .

[38]  Rajesh Srivastava,et al.  Product structure complexity and scheduling of operations in recoverable manufacturing , 1997 .

[39]  Robert U. Ayres,et al.  Eco-efficiency, asset recovery and remanufacturing , 1997 .

[40]  Surendra M. Gupta,et al.  Operations Planning Issues in an Assembly/Disassembly Environment , 1994 .

[41]  Erwin van der Laan,et al.  Product remanufacturing and disposal: A numerical comparison of alternative control strategies , 1996 .

[42]  Karl Inderfurth,et al.  Analysis of MRP Policies with Recovery Options , 1999 .

[43]  V. Daniel R. Guide,et al.  Repairable inventory theory: Models and applications , 1997 .

[44]  Rajesh Srivastava,et al.  Scheduling policies for remanufacturing , 1997 .

[45]  Geraldo Ferrer,et al.  The economics of tire remanufacturing , 1997 .

[46]  P. Shrivastava The Role of Corporations in Achieving Ecological Sustainability , 1995 .

[47]  Iie T. N. Goh Senior Member,et al.  A Statistical Methodology for the Analysis of the Life-Cycle of Reusable Containers , 1986 .

[48]  S. Vandermerwe,et al.  Customers drive corporations , 1990 .

[49]  K. Inderfurth Simple optimal replenishment and disposal policies for a product recovery system with leadtimes , 1997 .

[50]  T. Graedel Industrial Ecology , 1995 .

[51]  Simme Douwe P. Flapper,et al.  On the logistic aspects of integrating procurement, production and recycling by lean and agile-wise manufacturing companies , 1994 .

[52]  R. Frosch Industrial ecology: a philosophical introduction. , 1992, Proceedings of the National Academy of Sciences of the United States of America.

[53]  M. S. Spencer,et al.  An evaluation of capacity planning techniques in a remanufacturing environment , 1997 .

[54]  E. Silver,et al.  Purchasing Policy of New Containers Considering the Random Returns of Previously Issued Containers , 1989 .

[55]  L. W. Ayres,et al.  Industrial ecology: Towards closing the material cycle , 1996 .

[56]  V. D. R. Guide Scheduling using drum-buffer-rope in a remanufacturing environment , 1996 .

[57]  E. V. D. Laan,et al.  The Effects of Remanufacturing on Inventory Control , 1997 .

[58]  V D R Guide,et al.  Buffering from material recovery uncertainty in a recoverable manufacturing environment , 1997 .

[59]  Dundee Navtn-Chandra,et al.  The Recovery Problem in Product Design , 1994 .

[60]  de Aj Ad Ron,et al.  Determination of a disassembly strategy , 1996 .

[61]  Paul A. Zandbergen,et al.  Ecologically Sustainable Organizations: An Institutional Approach , 1995 .

[62]  Christian N. Madu A framework for environmental quality assessment , 1996 .