Sorting the Wheat from the Chaff: A Study of the Detection of Alarms
暂无分享,去创建一个
Neville A. Stanton | David Harrison | Karen L. Taylor-Burge | Les J. Porter | N. Stanton | D. Harrison | L. Porter | Karen L. Taylor-Burge
[1] Thomas F. Sanquist,et al. Protocol Analysis and Action Classification in the Evaluation of an Advanced Annunciator System Design , 1989 .
[2] David Meister. Conceptual Aspects of Human Factors , 1989 .
[3] E. C. Marshall,et al. An experiment to support the design of VDU-based alarm lists for power plant operators , 1995 .
[4] Neville A. Stanton,et al. Alarm initiated activities: matching formats to tasks , 1998 .
[5] Christopher D. Wickens,et al. Failure Detection in Dynamic Systems , 1981 .
[6] Neville A. Stanton,et al. Comparing speech versus text displays for alarm handling , 1997 .
[7] R. Shepard,et al. Mental Rotation of Three-Dimensional Objects , 1971, Science.
[8] David M. Usher. The alarm matrix , 1995 .
[9] H.J.G. Zwaga,et al. EVALUATION OF INTEGRATED CONTROL AND SUPERVISION SYSTEMS , 1984 .
[10] M. Defayolle. VIGILANCE AND ATTENTION , 1979 .
[11] J Edworthy,et al. Auditory affordances in the intensive treatment unit. , 1998, Applied ergonomics.
[12] Neville A. Stanton,et al. Alarm-initiated activities: an analysis of alarm handlingby operators using text-based alarm systems in supervisory control systems , 1995 .
[13] Frank P. McKenna,et al. Integrating multiple information sources: using redundancy in the design of warnings , 1995 .
[14] Eurochem,et al. Eurochem '83 : chemical engineering today, the challenge of change , 1983 .
[15] Robert D. Sorkin,et al. FORUM: Why are people turning off our alarms? , 1988 .
[16] H Harmen Kragt,et al. Process alarm systems as a monitoring tool for the operator , 1980 .
[17] David Woods,et al. Human factors challenges in process control: The case of nuclear power plants. , 1987 .
[18] Gwm Matthias Rauterberg. Different effects of auditory feedback in man-machine interfaces , 1999 .
[19] J P Bliss,et al. Human probability matching behaviour in response to alarms of varying reliability. , 1995, Ergonomics.
[20] David N. Hogg,et al. Development of a situation awareness measure to evaluate advanced alarm systems in nuclear power plant control rooms , 1995 .
[21] E. Cortes. LORA: an alarm handling software package , 1991 .
[22] M. Loeb,et al. The Psychology of Vigilance , 1982 .
[23] H. Kragt,et al. Evaluation of a conventional process-alarm system in a fertilizer plant , 1983, IEEE Transactions on Systems, Man, and Cybernetics.
[24] A. Hale,et al. Individual behaviour in the control of danger. , 1987 .