PERSONAL DIGITAL ASSISTANTS AS A MOBILE INSPECTION SYSTEM AT CONSTRUCTION SITE
暂无分享,去创建一个
[1] Chimay J. Anumba,et al. An integrated business improvement system (IBIS) for construction , 2005 .
[2] Chien-Chao Tseng,et al. Stateful session handoff for mobile WWW , 2006, Inf. Sci..
[3] Steven D. Tripp,et al. Rapid prototyping: An alternative instructional design strategy , 1990 .
[4] Luís Bernardo,et al. Seamless continuity of PS-services in WLAN/3G interworking , 2006, Comput. Commun..
[5] Satoru Iwashita,et al. The application of PDA as mobile computing system on construction management , 2005 .
[6] Albert P.C. Chan,et al. Construction process reengineering: a case study , 1999 .
[7] Joong Soo Ma,et al. Mobile Communications , 2003, Lecture Notes in Computer Science.
[8] Trefor P. Williams. Applying handheld computers in the construction industry , 2003 .
[9] A. Sohal,et al. Capturing rework costs in projects , 2003 .
[10] James H. Garrett,et al. Java Inspection Framework: Developing Field Inspection Support Systems for Civil Systems Inspection , 2003 .
[11] Hamzah Abdul-Rahman,et al. Capturing the cost of non‐conformance on construction sites , 1996 .
[12] Stephen O. Ogunlana,et al. Re-engineering construction communication in distance management framework , 2004, Bus. Process. Manag. J..
[13] A Jaafari,et al. Advanced Construction Management Information Systems , 1994 .
[14] Eddy M. Rojas,et al. Computer-Aided Facilities Inspection , 1999 .
[15] Andreas Paepcke,et al. Focused Web searching with PDAs , 2000, Comput. Networks.
[16] Sui Pheng Low,et al. Assessment of Defects at Construction and Occupancy Stages , 2005 .
[17] C. Anumba,et al. Business performance measurement practices in construction engineering organisations , 2005 .
[18] Chimay J. Anumba,et al. Reengineering construction business processes through electronic commerce , 2003 .
[19] David G. Platt. BUILDING PROCESS MODELS FOR DESIGN MANAGEMENT , 1996 .
[20] Sherif Ali Mohtady Mohamed,et al. Benchmarking and improving construction productivity , 1996 .
[21] Angappa Gunasekaran,et al. Business process development in project-based industry: A case study , 2004, Bus. Process. Manag. J..
[22] Chi Ming Tam,et al. A web‐based performance assessment system for environmental protection: WePass , 2004 .
[23] Stefan Gessler,et al. PDAs as MObile WWW Browsers , 1995, Comput. Networks ISDN Syst..
[24] Yacine Rezgui,et al. The Condor business process re‐engineering model , 2000 .
[25] Miguel Delgado,et al. A flexible architecture for distributed knowledge based systems with nomadic access through handheld devices , 2005, Expert Syst. Appl..
[26] Chimay J. Anumba,et al. Industrial Management & Data Systems Integrating product and process information in the construction sector , 2016 .
[27] Ralf Steinmetz,et al. Integrated Mobile Operations Support for the Construction Industry: The COSMOS Solution , 2001 .
[28] Mohamed Mohamed Naim,et al. POTENTIAL OF TOTAL CYCLE TIME COMPRESSION IN CONSTRUCTION: FOCUS ON PROGRAM DEVELOPMENT AND DESIGN , 2004 .