Strategic allocation of inspection effort in a serial, multi-product production system
暂无分享,去创建一个
[1] Leroy B. Schwarzx,et al. ON ECHELON HOLDING COSTS , 1978 .
[2] Glenn F. Lindsay,et al. Allocation of Screening Inspection Effort---A Dynamic-Programming Approach , 1964 .
[3] Robert R. Britney,et al. Optimal Screening Plans for Nonserial Production Systems , 1972 .
[4] Gary D. Eppen,et al. Optimal Location of Inspection Stations in a Multistage Production Process , 1974 .
[5] Leroy B. Schwarz,et al. Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems , 1975 .
[6] Leon S. White,et al. The Analysis of a Simple Class of Multistage Inspection Plans , 1966 .
[7] Bong Jin Yum,et al. The Optional Allocation of Inspection Effort in a Class of Nonserial Production Systems , 1981 .
[8] Linus Schrage,et al. Note---On Echelon Holding Costs , 1978 .
[9] Donald P. Ballou,et al. The Impact of Inspector Fallibility on the Inspection Policy in Serial Production Systems , 1982 .