Construction with quadrotor teams
暂无分享,去创建一个
Vijay Kumar | Daniel Mellinger | Quentin Lindsey | Vijay R. Kumar | Daniel Mellinger | Quentin Lindsey
[1] Jonathan P. How,et al. Mission Health Management for 24/7 Persistent Surveillance Operations , 2007 .
[2] Radhika Nagpal,et al. Distributed construction by mobile robots with enhanced building blocks , 2006, Proceedings 2006 IEEE International Conference on Robotics and Automation, 2006. ICRA 2006..
[3] Vijay Kumar,et al. Cooperative manipulation and transportation with aerial robots , 2009, Auton. Robots.
[4] Raffaello D'Andrea,et al. A simple learning strategy for high-speed quadrocopter multi-flips , 2010, 2010 IEEE International Conference on Robotics and Automation.
[5] Kyunghwan Kim,et al. A study on the advantages on high-rise building construction which the application of construction robots take (ICCAS 2007) , 2007, 2007 International Conference on Control, Automation and Systems.
[6] J F Henderson,et al. The dynamics of an airborne towed target system with active control , 1999 .
[7] Morgan Quigley,et al. ROS: an open-source Robot Operating System , 2009, ICRA 2009.
[8] Vijay Kumar,et al. Construction of Cubic Structures with Quadrotor Teams , 2011, Robotics: Science and Systems.
[9] Mikell P. Groover,et al. Automation, Production Systems, and Computer-Integrated Manufacturing , 1987 .
[10] Mark Yim,et al. Factory floor: A robotically reconfigurable construction platform , 2010, 2010 IEEE International Conference on Robotics and Automation.
[11] Vijay Kumar,et al. Cooperative Grasping and Transport Using Multiple Quadrotors , 2010, DARS.
[12] Vijay Kumar,et al. Autonomous multi-floor indoor navigation with a computationally constrained MAV , 2011, 2011 IEEE International Conference on Robotics and Automation.
[13] Claire J. Tomlin,et al. Precision flight control for a multi-vehicle quadrotor helicopter testbed , 2011 .
[14] Aaron M. Dollar,et al. Hovering Stability of Helicopters With Elastic Constraints , 2010 .
[15] Radhika Nagpal,et al. Collective construction of environmentally-adaptive structures , 2007, 2007 IEEE/RSJ International Conference on Intelligent Robots and Systems.
[16] Spring Berman,et al. Stochastic strategies for a swarm robotic assembly system , 2009, 2009 IEEE International Conference on Robotics and Automation.
[17] G. Boothroyd,et al. Design for assembly , 1993, IEEE Spectrum.
[18] Konstantin Kondak,et al. Generic slung load transportation system using small size helicopters , 2009, 2009 IEEE International Conference on Robotics and Automation.
[19] Justin Werfel,et al. TERMES: An Autonomous Robotic System for Three-Dimensional Collective Construction , 2011, Robotics: Science and Systems.
[20] Vijay Kumar,et al. The GRASP Multiple Micro-UAV Testbed , 2010, IEEE Robotics & Automation Magazine.
[21] Eric Klavins,et al. Robust by composition: Programs for multi-robot systems , 2010, 2010 IEEE International Conference on Robotics and Automation.
[22] Arthur C. Sanderson,et al. Assembly Sequence Planning , 1990, AI Mag..