Multi-Objective Decision Optimization of Construction Schedule Based on Improved TOPSIS

It is well known that construction project management involves such objectives as duration, cost, quality, resource leveling and so on. It is necessary to integrate and balance multiple objectives in management process. So this paper firstly analyzes single-objective optimization models such as durationcost model, duration-quality model and resource leveling model and the relationship between duration, cost, quality and resource leveling. On basis of that, the paper established a multi-objective optimization model of duration, cost, quality and resource leveling by taking comprehensive optimization as the goal and integrating with multi-objective technique. For traditional weighting method has strong subjectivity, an improved globaloptimization-based TOPSIS solution is presented. Good results are obtained when the model is employed in an engineering case, which verifies its superiority. It provides scientific basis for project decision-making and supports the decider powerfully. Keywords-multi-objective decision making(MODM); TOPSIS; construction schedule; optimization

[1]  Yu-Chun Huang,et al.  OPTIMIZATION MODEL FOR CONSTRUCTION PROJECT DURATIONS USING A MULTISTAGE DECISION PROCESS , 1998 .

[2]  Jian-Wen Huang,et al.  Research on Time-Cost Optimization Model of Construction Projects , 2008, 2008 4th International Conference on Wireless Communications, Networking and Mobile Computing.

[3]  Zhao Rui,et al.  Study on Multiple Objective Optimization Method in Construction Project Management , 2007, 2007 International Conference on Wireless Communications, Networking and Mobile Computing.

[4]  Yi-hong Zhou,et al.  An AHP-Based Fuzzy Evaluation Approach to Management of Sustainable Water Resources , 2007, 2007 International Conference on Wireless Communications, Networking and Mobile Computing.

[5]  Amr Kandil,et al.  MACROS: Multiobjective Automated Construction Resource Optimization System , 2006 .

[6]  E. Stanley Lee,et al.  An extension of TOPSIS for group decision making , 2007, Math. Comput. Model..

[7]  Mahmoud A. Abo-Sinna,et al.  Extensions of TOPSIS for large scale multi-objective non-linear programming problems with block angular structure , 2008 .

[8]  Wang Neng-min Fuzzy Tradeoff Optimization of Time-Cost-Quality in Construction Project , 2006 .

[9]  Mohammad Izadikhah,et al.  Extension of the TOPSIS method for decision-making problems with fuzzy data , 2006, Appl. Math. Comput..

[10]  Mo Jun-wen Model for Construction Project Scheduling and Updating Considering the Dependent Randomness of Activities , 2007, 2007 International Conference on Wireless Communications, Networking and Mobile Computing.

[11]  Mohammad Izadikhah,et al.  An algorithmic method to extend TOPSIS for decision-making problems with interval data , 2006, Appl. Math. Comput..