Nuclear Power Plants
暂无分享,去创建一个
[1] A. Introduction. AN APPROACH FOR PLANT-SPECIFIC RISK-INFORMED DECISIONMAKING FOR INSERVICE INSPECTION OF PIPING , 2012 .
[2] A. Dubreuil-Chambardel,et al. An Operating PSA Application at EDF: the Probabilistic Incident Analysis , 1996 .
[3] W. E. Vesely,et al. Handbook of methods for risk-based analysis of technical specifications , 1996 .
[4] W. E. Vesely,et al. Risk based optimization of the frequency of EDG on-line maintenance at Hope Creek , 1996 .
[5] A. R. Marchese,et al. Risk-Based Approach to Analyzing Operating Events , 1996 .
[6] Wu Zhongwang. Operational safety performance indicators for nuclear power plants , 2006 .
[7] Stan Uryasev,et al. Emergency diesel generator: Maintenance and failure unavailability, and their risk impacts , 1994 .
[8] A. Introduction,et al. AN APPROACH FOR USING PROBABILISTIC RISK ASSESSMENT IN RISK-INFORMED DECISIONS ON PLANT- SPECIFIC CHANGES TO THE LICENSING BASIS , 2009 .
[9] W. E. Vesely,et al. Reviewing PSA-based analyses to modify technical specifications at nuclear power plants , 1995 .
[10] J. W. Cletcher,et al. Precursors to potential severe core damage accidents, 1990: A status report , 1990 .
[11] J. W. Minarick,et al. Precursors to potential severe core damage accidents, 1969-1979, a status report , 1982 .