The capacitated dynamic lot size problem with variable technology
暂无分享,去创建一个
[1] Suresh P. Sethi,et al. A Dynamic Lot Sizing Model with Learning in Setups , 1990, Oper. Res..
[2] Luk N. Van Wassenhove,et al. Multi-Item Single-Level Capacitated Dynamic Lot-Sizing Heuristics: A General Review , 1988 .
[3] Laurence A. Wolsey,et al. Progress With Single-item Lot-sizing , 1995 .
[4] Suresh Chand,et al. Lot sizes and setup frequency with learning in setups and process quality , 1989 .
[5] Louis E. Yelle. THE LEARNING CURVE: HISTORICAL REVIEW AND COMPREHENSIVE SURVEY , 1979 .
[6] Ram Rachamadugu,et al. PERFORMANCE OF A MYOPIC LOT SIZE POLICY WITH LEARNING IN SETUPS , 1994 .
[7] D. Collier. A comparison of MRP lot sizing methods considering capacity change costs , 1980 .
[8] Jatinder N. D. Gupta,et al. OR Practice - Determining Lot Sizes and Resource Requirements: A Review , 1987, Oper. Res..
[9] Kavindra Malik,et al. An improved algorithm for the dynamic lot‐sizing problem with learning effect in setups , 1993 .
[10] Kirk R. Karwan,et al. Production lot sizing under setup and worker learning , 1988 .
[11] Dean H. Kropp,et al. The New Manufacturing Challenge: Techniques for Continuous ImprovementThe New Manufacturing Challenge: Techniques for Continuous Improvement, by SuzakiKiyoshi. New York: Free Press, 1987, 270 pp., $24.95, cloth. , 1988 .
[12] Jatinder N. D. Gupta,et al. Determining lot sizes and resource requirements: A review , 1987 .