Production system design for quality robustness
暂无分享,去创建一个
[1] Ping Yang,et al. Determining a threshold control policy for an imperfect production system with rework jobs , 1999 .
[2] Barış Tan,et al. Analysis of multistation production systems with limited buffer capacity part 2: The decomposition method , 1997 .
[3] Jingshan Li,et al. Throughput analysis in automotive paint shops: a case study , 2004, IEEE Transactions on Automation Science and Engineering.
[4] Sittichai Matanachai,et al. Balancing mixed-model assembly lines to reduce work overload , 2001 .
[5] Tzvi Raz,et al. Economic optimization of off-line inspection in a process subject to failure and recovery , 2005 .
[6] Dennis Blumenfeld,et al. Manufacturing system design to improve quality buy rate , 2005, IEEE International Conference on Automation Science and Engineering, 2005..
[7] Semyon M. Meerkov,et al. Asymptotically reliable serial production lines with a quality control system , 1991 .
[8] Akif Asil Bulgak,et al. Impact of quality improvement on optimal buffer designs and productivity in automatic assembly systems , 1992 .
[9] Semyon M. Meerkov,et al. On asymptotically reliable closed serial production lines , 1993 .
[10] Dennis Blumenfeld,et al. Quality robustness design of manufacturing systems with repair and rework , 2006, Proceedings 2006 IEEE International Conference on Robotics and Automation, 2006. ICRA 2006..
[11] B. Heflinger,et al. Demountable TAB-a new path for TAB technology , 1994 .
[12] Dennis E. Blumenfeld,et al. Designing production systems for quality: Research opportunities from an automotive industry perspective , 2003 .
[13] Barış Tan,et al. Analysis of multistation production systems with limited buffer capacity part 1: The subsystem model , 1997 .
[14] Nukala Viswanadham,et al. Inspection allocation in manufacturing systems using stochastic search techniques , 1996, IEEE Trans. Syst. Man Cybern. Part A.
[15] Jaideep Motwani,et al. The effect of straight- and U-shaped lines on quality , 2000, IEEE Trans. Engineering Management.
[16] Jingshan Li,et al. Overlapping decomposition: a system-theoretic method for modeling and analysis of complex manufacturing systems , 2005, IEEE Transactions on Automation Science and Engineering.
[17] Ron S. Kenett,et al. The impact of defects on a process with rework , 1995 .
[18] Gad Rabinowitz,et al. Optimal robot operation and selection using quality and output trade-off , 1995 .
[19] J.-T. Lim,et al. Homogeneous, asymptotically reliable serial production lines: theory and a case study , 1990 .
[20] J.-T. Lim,et al. Performance analysis of serial production lines with quality inspection machines , 1998, Int. J. Syst. Sci..
[21] Yadati Narahari,et al. Modeling reentrant manufacturing systems with inspection stations , 1996 .
[22] Ningjian Huang,et al. Quality Evaluation in Flexible Manufacturing Systems: A Markovian Approach , 2007 .
[23] Young K. Son,et al. Economic measure of productivity, quality and flexibility in advanced manufacturing systems , 1987 .
[24] Ping Yang,et al. Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs , 1996 .
[25] Stanley B. Gershwin,et al. Quality and Quantity Modeling of a Production Line , 2004 .
[26] Stanley B. Gershwin,et al. Integrated quality and quantity modeling of a production line , 2005, OR Spectr..
[27] G. D. Taylor,et al. Stock level determination and sensitivity analysis in repair/rework operations , 1998 .
[28] Ndy Ekere,et al. Rework techniques process evaluation for chip scale packages , 2000 .
[29] Y. Narahari,et al. Transient analysis of manufacturing systems performance , 1994, IEEE Trans. Robotics Autom..
[30] Richard M. Feldman,et al. Optimization of process improvement and inspection location for serial manufacturing , 1996 .
[31] D. Y. Sha,et al. Wafer rework strategies at the photolithography stage , 2001 .
[32] Timothy L. Urban. Analysis of production systems when run length influences product quality , 1998 .
[33] Jingshan Li,et al. Performance analysis of production systems with rework loops , 2004 .