A multiobjective operations planning model with unit commitment and transmission constraints
暂无分享,去创建一个
[1] E. Handschin,et al. Coordination of long- and short-term generation planning in thermal power systems , 1995 .
[2] Ross Baldick,et al. The generalized unit commitment problem , 1995 .
[3] Hans B. Puttgen,et al. The integration of nonutility generation and spot prices within utility generation scheduling , 1994 .
[4] Jyoti K. Parikh,et al. A systems approach to least-cost maintenance scheduling for an interconnected power system , 1995 .
[5] E. Handschin,et al. Unit commitment in thermal power systems with long-term energy constraints , 1989, Conference Papers Power Industry Computer Application Conference.
[6] Jyoti K. Parikh,et al. Integrating demand side options in electric utility planning: a multiobjective approach , 1995 .
[7] T. Saaty,et al. The Analytic Hierarchy Process , 1985 .
[8] Roy Billinton,et al. A minimum cost assessment method for composite generation and transmission system expansion planning , 1993 .
[9] B. Gorenstin,et al. Power system expansion planning under uncertainty , 1993 .
[10] Benjamin F. Hobbs,et al. Optimization methods for electric utility resource planning , 1995 .