퍼지이론을 이용한 철도 전력 설비의 Risk Priority Number 산정
暂无分享,去创建一个
The RPN provides information which includes the risk level and the priority order of maintenance tasks for components. However, if there is no sufficient historical failure data, the historical failure data from other sources can be applied to the target system. And if we use historical data from other sources without any process, there will be concomitant problems according to a discord of each system characteristic, a difference between the present and the date of failure data, etc. In this paper, a new methodology is proposed to model the failure rate as a fuzzy function to resolve these problems. Taking advantage of this result, the RPN can be calculated by using the fuzzy operation. The proposed method is applied to the substation system.