Mixed-model multi-manned assembly line balancing problem: a mathematical model and a simulated annealing approach
暂无分享,去创建一个
[1] S. David Wu,et al. A new heuristic method for mixed model assembly line balancing problem , 2003 .
[2] C Merengo,et al. Balancing and sequencing manual mixed-model assembly lines , 1999 .
[3] A Sedighi,et al. A cost-oriented model for balancing mixed-model assembly lines with multi-manned workstations , 2013 .
[4] Bilal Toklu,et al. A priority rule-based constructive heuristic and an improvement method for balancing assembly lines with parallel multi-manned workstations , 2015 .
[5] Subhash C. Sarin,et al. A survey of the assembly line balancing procedures , 1998 .
[6] Bilal Toklu,et al. Balancing of mixed-model two-sided assembly lines , 2009, Comput. Ind. Eng..
[7] Abolfazl Kazemi,et al. A COST-ORIENTED MODEL FOR MULTI-MANNED ASSEMBLY LINE BALANCING PROBLEM , 2013 .
[8] Hadi Gökçen,et al. Shortest-route formulation of mixed-model assembly line balancing problem , 1999, Eur. J. Oper. Res..
[9] Emre Cevikcan,et al. A team-oriented design methodology for mixed model assembly systems , 2009, Comput. Ind. Eng..
[10] Wen-Chyuan Chiang,et al. The stochastic U-line balancing problem: A heuristic procedure , 2006, Eur. J. Oper. Res..
[11] Sotirios G. Dimitriadis,et al. Assembly line balancing and group working: A heuristic procedure for workers' groups operating on the same product and workstation , 2006, Comput. Oper. Res..
[12] George B. Dantzig,et al. Planning under uncertainty using parallel computing , 1988 .
[13] Patrick R. McMullen,et al. Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations , 1998 .
[14] Adil Baykasoğlu,et al. Modeling and solving mixed-model assembly line balancing problem with setups. Part I: A mixed integer linear programming model , 2014 .
[15] Nils Boysen,et al. Jena Research Papers in Business and Economics Balancing mixed-model assembly lines : A computational evaluation of objectives to smoothen workload , 2008 .
[16] Hadi Gökçen,et al. Balancing and sequencing of parallel mixed-model assembly lines , 2010 .
[17] George L. Nemhauser,et al. An Algorithm for the Line Balancing Problem , 1964 .
[18] Maurizio Faccio,et al. Balancing–sequencing procedure for a mixed model assembly system in case of finite buffer capacity , 2009 .
[19] Maurizio Faccio,et al. Sequencing procedure for balancing the workloads variations in case of mixed model assembly system with multiple secondary feeder lines , 2012 .
[20] C. D. Gelatt,et al. Optimization by Simulated Annealing , 1983, Science.
[21] James H. Patterson,et al. An Integer Programming Algorithm with Network Cuts for Solving the Assembly Line Balancing Problem , 1984 .
[22] Armin Scholl,et al. State-of-the-art exact and heuristic solution procedures for simple assembly line balancing , 2006, Eur. J. Oper. Res..
[23] Mustafa Yilmaz,et al. Multi-manned assembly line balancing problem with balanced load density , 2015 .
[24] Alexandre Dolgui,et al. A taxonomy of line balancing problems and their solutionapproaches , 2013 .
[25] Pedro M. Vilarinho,et al. ANTBAL: an ant colony optimization algorithm for balancing mixed-model assembly lines with parallel workstations , 2006 .
[26] Mustafa Yilmaz,et al. A multi-manned assembly line balancing problem with classified teams: a new approach , 2016 .
[27] Armin Scholl,et al. Balancing assembly lines with variable parallel workplaces: Problem definition and effective solution procedure , 2009, Eur. J. Oper. Res..
[28] Tung-Meng Chang,et al. SIMULTANEOUS PERSPECTIVE-BASED MIXED-MODEL ASSEMBLY LINE BALANCING PROBLEM , 2010 .
[29] Thomas R. Hoffmann. Assembly Line Balancing with a Precedence Matrix , 1963 .
[30] Azadeh Esfandyari,et al. A simulated annealing algorithm for multi-manned assembly line balancing problem , 2013 .
[31] Maurizio Faccio,et al. Mixed model assembly system with multiple secondary feeder lines: layout design and balancing procedure for ATO environment , 2012 .
[32] J. J. Bartholdi,et al. Balancing two-sided assembly lines: a case study , 1993 .
[33] Soumen Ghosh,et al. A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems , 1989 .
[34] Parviz Fattahi,et al. A mathematical model and ant colony algorithm for multi-manned assembly line balancing problem , 2011 .
[35] James R. Jackson,et al. A Computing Procedure for a Line Balancing Problem , 1956 .
[36] Armin Scholl,et al. A survey on problems and methods in generalized assembly line balancing , 2006, Eur. J. Oper. Res..
[37] Parviz Fattahi,et al. Sequencing mixed-model assembly lines by considering feeding lines , 2012 .
[38] Ezey M. Dar-El,et al. Assembly line sequencing for model mix , 1975 .
[39] Davide Giglio,et al. Simulated annealing algorithms for the multi-manned assembly line balancing problem: minimising cycle time , 2017, Int. J. Prod. Res..
[40] Uğur Özcan,et al. A tabu search algorithm for two-sided assembly line balancing , 2009 .
[41] Bilal Toklu,et al. An efficient branch and bound algorithm for assembly line balancing problems with parallel multi-manned workstations , 2012, Comput. Oper. Res..
[42] Talip Kellegöz,et al. Assembly line balancing problems with multi-manned stations: a new mathematical formulation and Gantt based heuristic method , 2017, Ann. Oper. Res..
[43] P. Sivasankaran,et al. Literature review of assembly line balancing problems , 2014 .
[44] Javad Zahiri,et al. Multi-criteria sequencing problem in mixed-model synchronous assembly lines , 2013 .