Approximate evaluation of order fill rates for an inventory system of service tools
暂无分享,去创建一个
[1] John W. Mamer,et al. Job Completion Based Inventory Systems: Optimal Policies for Repair Kits and Spare Machines , 1985 .
[2] Dirk Cattrysse,et al. Simple, efficient heuristics for multi-item multi-location spare parts systems with lateral transshipments and waiting time constraints , 2005, J. Oper. Res. Soc..
[3] Daniel Granot,et al. The Repair Kit Problem Revisited , 1993, Oper. Res..
[4] John W. Mamer,et al. A constrained capital budgeting problem with applications to repair kit selection , 1987 .
[5] Jing-Sheng Song,et al. The Effectiveness of Several Performance Bounds for Capacitated Production, Partial-Order-Service, Assemble-to-Order Systems , 2003, Manuf. Serv. Oper. Manag..
[6] Craig C. Sherbrooke,et al. Optimal Inventory Modeling of Systems: Multi-Echelon Techniques (INTL SERIES IN OPERATIONS RESEARCH & MANAGEMENT SCIENCE) , 1992 .
[7] Jacob Cohen,et al. On regenerative processes in queueing theory , 1976 .
[8] S. Graves,et al. Supply chain management : design, coordination and operation , 2003 .
[9] W. J. Kennedy,et al. An overview of recent literature on spare parts inventories , 2002 .
[10] John W. Mamer,et al. Optimizing Field Repair Kits Based on Job Completion Rate , 1982 .
[11] Craig C. Sherbrooke,et al. Optimal Inventory Modeling of Systems , 1992 .
[12] Ruud H. Teunter. The multiple-job repair kit problem , 2006, Eur. J. Oper. Res..
[13] Jing-Sheng Song,et al. Supply Chain Operations: Assemble-to-Order Systems , 2003, Supply Chain Management.
[14] George L. Nemhauser,et al. Handbooks in operations research and management science , 1989 .
[15] Jing-Sheng Song,et al. The Eectiveness of Several Performance Bounds for Capacitated Assemble-to-Order Systems , 2003 .
[16] Arthur F. Veinott,et al. Analysis of Inventory Systems , 1963 .
[17] D. Simchi-Levi,et al. On assemble-to-order systems with flexible customers , 2003 .
[18] John A. Muckstadt,et al. Analysis and Algorithms for Service Parts Supply Chains , 2008 .
[19] G. J. Houtum,et al. Effect of commonality on spare parts provisioning costs for capital goods , 2007 .
[20] Bin Liu,et al. Order-Fulfillment Performance Measures in an Assemble-to-Order System with Stochastic Leadtimes , 1999, Oper. Res..