Decision‐making optimization of power system extended black‐start coordinating unit restoration with load restoration
暂无分享,去创建一个
[1] Can Zhang,et al. Network partitioning strategy for parallel power system restoration , 2016 .
[2] Pei Zhang,et al. Computation of Milestones for Decision Support During System Restoration , 2011, IEEE Transactions on Power Systems.
[3] Chong Wang,et al. OBDD-Based Sectionalizing Strategies for Parallel Power System Restoration , 2011, IEEE Transactions on Power Systems.
[4] S. Nourizadeh,et al. A power system build‐up restoration method based on wide area measurement systems , 2011 .
[5] T. Nagata,et al. A multi-agent approach to power system restoration , 2002 .
[6] Fushuan Wen,et al. Multi-objective restoration optimisation of power systems with battery energy storage systems , 2016 .
[7] Wu Ye,et al. Optimal power grid black start using fuzzy logic and expert system , 2009 .
[8] Kevin M. Passino,et al. Biomimicry of bacterial foraging for distributed optimization and control , 2002 .
[9] S. Mishra. Bacteria foraging based solution to optimize both real power loss and voltage stability limit , 2007, 2007 IEEE Power Engineering Society General Meeting.
[10] Durlav Hazarika,et al. Power system restoration: planning and simulation , 2003 .
[11] Minjie Zhang,et al. A Hybrid Multiagent Framework With Q-Learning for Power Grid Systems Restoration , 2011, IEEE Transactions on Power Systems.
[12] B. Vahidi,et al. Bacterial Foraging-Based Solution to the Unit-Commitment Problem , 2009, IEEE Transactions on Power Systems.
[13] Yutian Liu,et al. Power system restoration: a literature review from 2006 to 2016 , 2016 .
[14] Yi-Ting Chou,et al. Development of a Black Start Decision Supporting System for Isolated Power Systems , 2013, IEEE Transactions on Power Systems.
[15] Yan Zhang,et al. A flexible black‐start network partitioning strategy considering subsystem recovery time balance , 2015 .
[16] Hermann W. Dommel,et al. Power system restoration — a bibliographical survey , 2001 .
[17] Jianzhong Tong,et al. Optimal Black Start Resource Allocation , 2016, IEEE Transactions on Power Systems.
[18] N. Chowdhury,et al. A Case-Based Windows Graphic Package for the Education and Training of Power System Restoration , 2001 .
[19] Wei Sun,et al. Optimal Generator Start-Up Strategy for Bulk Power System Restoration , 2011, IEEE Transactions on Power Systems.
[20] Hao Zhou,et al. Division algorithm and interconnection strategy of restoration subsystems based on complex network theory , 2011 .
[21] Minjie Zhang,et al. Conceptual Design of A Multi-Agent System for Interconnected Power Systems Restoration , 2012, IEEE Transactions on Power Systems.
[22] Can Zhang,et al. Two-stage power network reconfiguration strategy considering node importance and restored generation capacity , 2013 .
[23] Fushuan Wen,et al. A Restorative Self-Healing Algorithm for Transmission Systems Based on Complex Network Theory , 2016, IEEE Transactions on Smart Grid.
[24] Mircea Eremia,et al. Decision support for restoration of interconnected power systems using tie lines , 2015 .
[25] K. N. Srinivas,et al. Restoration of power network – a bibliographic survey , 2011 .
[26] S. Nourizadeh,et al. Power system stability assessment during restoration based on a wide area measurement system , 2012 .
[27] T. Genji,et al. Comparative Study of Modern Heuristic Algorithms to Service Restoration in Distribution Systems , 2001, IEEE Power Engineering Review.
[28] Ali Mohammad Ranjbar,et al. A Sectionalizing Method in Power System Restoration Based on WAMS , 2011, IEEE Transactions on Smart Grid.