MO-Greedy: An Extended Beam-Search Approach for Solving a Multi-criteria Scheduling Problem on Heterogeneous Machines
暂无分享,去创建一个
[1] Emmanuel Jeannot,et al. Evaluation and Optimization of the Robustness of DAG Schedules in Heterogeneous Environments , 2010, IEEE Transactions on Parallel and Distributed Systems.
[2] Mourad Hakem,et al. Reliability and Scheduling on Systems Subject to Failures , 2007, 2007 International Conference on Parallel Processing (ICPP 2007).
[3] Jose M. Framiñan,et al. A multi-objective iterated greedy search for flowshop scheduling with makespan and flowtime criteria , 2008, OR Spectr..
[4] Lucas Bradstreet,et al. A Fast Incremental Hypervolume Algorithm , 2008, IEEE Transactions on Evolutionary Computation.
[5] P. McMullen,et al. A beam search heuristic method for mixed-model scheduling with setups , 2005 .
[6] Manoj Kumar Tiwari,et al. New solution methods for single machine bicriteria scheduling problem: Minimization of average flowtime and number of tardy jobs , 2010, Eur. J. Oper. Res..
[7] Prabuddha De,et al. Heuristic Estimation of the Efficient Frontier for a Bi‐Criteria Scheduling Problem , 1992 .
[8] Roberta S. Russell,et al. Using beam search techniques for sequencing mixed-model assembly lines , 1997, Ann. Oper. Res..
[9] M. Azizoglu,et al. Bicriteria scheduling problem involving total tardiness and total earliness penalties , 1991 .
[10] Emmanuel Jeannot,et al. Bi-objective scheduling algorithms for optimizing makespan and reliability on heterogeneous systems , 2007, SPAA '07.
[11] Bruce T. Lowerre,et al. The HARPY speech recognition system , 1976 .
[12] Marco Laumanns,et al. PISA: A Platform and Programming Language Independent Interface for Search Algorithms , 2003, EMO.
[13] Marco Laumanns,et al. Performance assessment of multiobjective optimizers: an analysis and review , 2003, IEEE Trans. Evol. Comput..
[14] El-Ghazali Talbi,et al. ParadisEO: A Framework for the Reusable Design of Parallel and Distributed Metaheuristics , 2004, J. Heuristics.
[15] Emmanuel Jeannot,et al. Bi-objective Approximation Scheme for Makespan and Reliability Optimization on Uniform Parallel Machines , 2008, Euro-Par.
[16] Ming Zhong,et al. Bicriteria train scheduling for high-speed passenger railroad planning applications , 2005, Eur. J. Oper. Res..
[17] Salim Hariri,et al. Task scheduling algorithms for heterogeneous processors , 1999, Proceedings. Eighth Heterogeneous Computing Workshop (HCW'99).
[18] Lothar Thiele,et al. On Set-Based Multiobjective Optimization , 2010, IEEE Transactions on Evolutionary Computation.