The ESO's ELT construction status
暂无分享,去创建一个
Bertrand Koehler | Michele Cirasuolo | Roberto Tamai | Fabio Biancat-Marchet | Mauro Tuti | Juan Carlos Gonzáles Herrera
[1] Bertrand Koehler,et al. The E-ELT program status , 2016, Astronomical Telescopes + Instrumentation.
[2] Mark Casali,et al. Instrumentation for ESO's Extremely Large Telescope , 2018, Astronomical Telescopes + Instrumentation.
[3] F. Gonte,et al. Getting ready for serial production of the segmented 39-meter ELT primary: status, challenges and strategies , 2018, Astronomical Telescopes + Instrumentation.
[4] Gianluca Chiozzi,et al. The ELT control system , 2018, Astronomical Telescopes + Instrumentation.
[5] J.C. González-Herrera,et al. ESO ELT system requirements verification , 2018, Astronomical Telescopes + Instrumentation.
[6] Stefano Stanghellini,et al. Procurement of the dome and the telescope structure of the ESO ELT: status report , 2018, Astronomical Telescopes + Instrumentation.
[7] P. La Penna,et al. Extremely Large Telescope Prefocal Station A system concept , 2018, Astronomical Telescopes + Instrumentation.
[8] Luigi Andolfato,et al. Designing and managing software interfaces for the ELT , 2018, Astronomical Telescopes + Instrumentation.
[9] Luigi Andolfato,et al. ESO ELT M1 local control system software design and development status (Conference Presentation) , 2018 .
[10] Matteo Accardo,et al. Cryogenic cooling systems for the ELT instruments , 2018, Astronomical Telescopes + Instrumentation.